Start-up
27 | 68
B
A
_
TD
3
-CK0
0
0
e
n
_
0
2
4
_
e
x
a
liQ.
d
o
cx
The dosing line is connected to the pump and is guided out of the housing without tension.
1.
Determine the required length of the dosing line
– depending on the installation
situation.
2.
Push the union nut, collet and O-ring on the dosing line.
3.
Shorten the dosing line.
4.
Insert the end of the line into the dosing valve as far as it will go.
5.
Screw the dosing line finger tight with the union nut.
» The dosing line is connected.