Installation
18 | 68
B
A
_
TD
3
-CK0
0
0
e
n
_
0
2
4
_
e
x
a
liQ.
d
o
cx
4.2
Requirements with regard to the installation site
Observe local installation directives, general guidelines and technical specifications.
● The installation site must be frost-proof and ensure the product is protected from
chemicals, dyes, solvents and vapours.
● The installation site must be adequately illuminated and ventilated.
● Always install a drinking water filter and, if required, a pressure reducer (e.g. fine
filter pureliQ:KD) upstream of the product.
● A shock-proof socket is required within a distance of approx. 1.2 m of the system.
● A floor drain suitable for the system size must be available at the installation site or
a protection device e.g. protectliQ or a protection device with water stop of the
same quality must be installed.
● Downstream of the dosing point, a water withdrawal point must be available.
Space required:
● For operation/cleaning/maintenance of the dosing 800 mm to the
front/side
● For changing the container (bottle) + 300 mm downwards
● For operating the control unit + 150 mm upwards
4.3
Checking the scope of supply
4.3.1
exaliQ:KC6/KC6-e
Item
Designation
Item
Designation
1
Turbine water meter with screw connections
(Version: KC6)
2
Attachment
3
24 V plug-in power supply with power supply
cable
4
Dosing pump exaliQ
5
Fastening material with dosing valve
6
Operation manual
7
iQ-Comfort cable (version: KC6-e)