GrowSpan 113577 Manual Download Page 6

66

Revision date: 12.17.14

Complete these steps:
1.  If main cover film is installed, remove the spring wire that secures 

the cover in the u-channel until the lower edge of the cover is 

loose. Also, remove the cover from the end rafter u-channel to 

allow for the installation of the 111613Z144. 

 

NOTE:

 Dashed line identifies the u-channel that must be 

removed to allow for the installation of the rainwater catch drain 

components. For a new construction, first install the ribbon board 

as instructed in the building instruction manual and then install 

the 111613Z144 as noted in these diagrams.

1

RAINWATER CATCH DRAIN INSTALLATION

Assembly Instructions

Diagram shows 

the 111613Z144 

installed.

111613Z144

Not to 

exceed 

16".

Not to 

exceed 

16".

Building Cover

 *Included with rainwater 

catch drain  kit.

**Supplied by customer.

*111613Z144 

Secure to rafter using 

*FA4482B Tek screws.

**Ribbon board and 

u-channel for drop-down 

or roll-up side panel. See 

main building instructions 

to install.   

Single u-channel is 

shown. Depending on 

building design, double 

u-channel may also be in 

this position to secure roof 

material and roll-up side.

U-channel attached 

to end rafters. Cut 

to allow for the 

installation of the kit

components.

2.  Using the diagram, 

determine where 

to install the 

111613Z144 that 

runs the length of 

the building frame 

along the side.

3.  Mark height at both 

ends ensuring that 

the 111613Z144 will 

be level along the 

side. Use a string 

line or chalk line to 

mark each rafter.

4.  Attach the 

111613Z144 to 

building rafters 

using FA4482B Tek 

screws included 

with the kit. Install 

one screw every 

48" on-center to 

secure.

ATTENTION:

 Building design must include a roll-up or drop-down side. If your 

building does not include either of these, contact customer service to purchase 

additional u-channel and spring wire. 

Do not continue with the installation of this 

kit without consulting with customer service.

Summary of Contents for 113577

Page 1: ...rame 113578 48 Rainwater Catch Drain for 48 Long Frame 113579 60 Rainwater Catch Drain for 60 Long Frame 113580 72 Rainwater Catch Drain for 72 Long Frame 113581 96 Rainwater Catch Drain for 96 Long F...

Page 2: ...t the Pictorial Parts Guide and all diagrams for clarification or contact Customer Service 3 Read and understand these instructions and all additional documentation included with the shipment before y...

Page 3: ...sition on the building frame NOTE Install the 113074 brackets when the curve of the rafter is too great to allow for the installation of customer supplied 1 x 4 boards Brackets help to plumb the board...

Page 4: ...dditional purchase required is typically installed at the drain end of the gutter to store water Gutter slopes throughout its length to ensure proper drainage 111613Z144 Reservoir additional purchase...

Page 5: ...113074 bracket using FA4484B Tek screws Countersink screws for best results Ribbon board and u channel for drop down or roll up side panel See main building instructions if applicable Free end of cove...

Page 6: ...g FA4482B Tek screws Ribbon board and u channel for drop down or roll up side panel See main building instructions to install Single u channel is shown Depending on building design double u channel ma...

Page 7: ...ee diagrams on previous page For best results mount the gutter 3 4 above the ribbon board for the drop down and roll up sides 7 Move to the low end and mark end rafter to set the required slope Snap a...

Page 8: ...Sample Frame without 113074 Bracket Attach ribbon board directly to rafter If rafters are straight where the gutter will be installed 113074 brackets are typically not used Attach customer supplied 1...

Page 9: ...gutter brackets 113623 over the film and to the ribbon board using the FA4652 wood screws Building Cover Secure 2 film in channel using 102198 spring wire Secure 2 wide film in building u channel usin...

Page 10: ...gutter sections onto the gutter brackets Position high end flush with the outer edge of the building rafter Use the 113624 connectors to join each 10 section and glue each connection using the 113628...

Page 11: ...osition and seal with the 113628 cement Install the end cap and glue in place using the 113628 cement 14 Return to the high end of the gutter and install that end cap Glue in place 15 Continue by secu...

Page 12: ...nd around gutter bracket 2 Use a utility knife or similar tool to make a cut at the first gutter bracket Cut to the edge of the cover 5 Repeat the steps to cut the cover at each gutter bracket When co...

Page 13: ...e gutter 8 Take one 109108 fiberglass stake and beginning at one end thread the stake through the slits in the cover 11 Make additional cuts as needed when adding stakes or custom fitting the stakes i...

Reviews: