background image

                                                                                                                         

Marketing Department 

                                                                                                                                                                F

+ 86 755 2951 5888      +86 755 2747 2131   

[email protected]    W

  www.growatt.com    W

  www.ginverter.com 

 

 

B, SPH hybrid inverter terminal. 

 

 

Figure2.SPH connect terminal position 

2,How to install the battery in the IP55 Battery Box

 

A, Use a Phillips screwdriver to loosen the six Phillips countersunk screws on the left and right 
sides of the case (as shown in FIG. 3). Move the front panel up and away from the front panel (as 
shown in figure 4) to avoid the l-shaped drop bracket on the upper part of the case from hanging 
(as shown in figure 5).   
 
B. Place the lithium iron phosphate battery as shown in the figure (note the placement direction of 
the battery: the battery power terminal is on the right side of the chassis), tighten it with 4 M6*12 
hexagonal combination bolts (as shown in figure6), and fix the other battery in this way (as shown 
in figure7. 

 

Reviews: