Growatt ShineVision Operation Manual Download Page 7

LCD will automatically refresh its display in the default interface.

2.6 Default interface display

The  first  line  displays  in  default  the  total  real-time  power  of  all  photovoltaic 
inverters.

The second line displays the actual generated energy, generation revenue and 
CO2 emissions by all photovoltaic inverters on the day and the three data are 
displayed once every 5s and in cycle.

There  are  two  modes  in  the  third  line.  The  first  is  to  show  the  actual 
accumulated generated energy, generation revenue and CO2 emissions by all 
photovoltaic inverters in the month, as shown in Figure 20 to 22; the second is 
to show the actual accumulated electric energy, generation revenue and CO2 
emissions  by  all  photovoltaic  inverters.  The  two  modes  are  divided  into  six 
interfaces and each interface is displayed once every 5s and in cycle, as shown 
in Figure 17 to 22. The sequence of cycle is from Total to Month.

The fourth line shows the time and temperature.

1.

2.

3.

4.

Notes: 

When  the  monitor  receives  error  information  of  photovoltaic  inverters,  the 

first  line  will  display  “Error”  and  its  relevant  wrong  code  (supposing  000). 
Meanwhile,  the  buzzer  will  alarm  twice  every  five  minutes  (if  the  buzzer  is  set 
opened), as shown in Figure 26 and the LEC lamp will flash once every second. The 
display results of the second and third lines must be corresponding to each other. It 
means when the second line displays generated energy on the day, the third line must 
display  the  total  generated  energy  or  generated  energy  of  the  month  at  the  same 
time.  The  data  must  be  displayed  correspondingly  and  in  cycle  and  the  means  of 
display in cycle is Today-Total and Today-Month, as shown in Figure 17 to 22.

Figure 26

 

There are two modes in the third line, one showing the generated energy, generation 
revenue and CO2 emissions in the month and the other showing the total generated 
energy,  total  generation  revenue  and  total  CO2  emissions.  Two  modes  are  divided 
into six interfaces and each interface is displayed after every 5s in cycle, as shown in

Figure  17  to  22.  The  means  of  display  in  cycle  is  Today-Total-Today-Month.  Press 
“OK”  for  a  short  while  in  the  default  interface,  you  will  enter  the  enquiry  of  daily, 
monthly and total data. When entering the enquiry interface, the historical daily and 
total data will be displayed, as shown in Figure 17. Then, press “Down” for a short 
while for enquiry of generated energy, generation revenue and CO2 emissions from 
Today to Total in sequence, as shown in Figure 17 to 19, and for enquiry of generated 
energy, generation revenue and CO2 emissions from Today to Month in sequence, as 
shown  in  Figure  20  to  22.  Or  press  “Up”  for  a  short  whole,  and  you  will  see  the 
enquiry  results  in  the  opposite  direction.  The  default  interface  will  appear  by 
pressing  “OK”  for  a  short  while  in  any  interface  of  enquiry  or  when  there  is  no 
operation of enquiry at all in 30s.

The fourth line indicates time and temperature.

2)  Press  "Up"  or  “Down”  for  a  short  while  in  the  default  interface  (Figure  8),  then 
you  will  enter  the  enquiry  of  phase  voltage  and  two-circuit  PV  voltage  for  three-
phase AC of each channel, as shown in Figure 23 (showing the enquiry result of CH: 
01  channel;  the  enquiry  for  other  channels  are  similar  to  it).  After  entering  such 
enquiry, press “OK” for a short while, and then you will enquiry in sequence and in 
cycle “Rvolt--- PV1”, “Svolt--- PV2” and “Tvolt--- PV1”, as shown in Figure 23 to 25. 
If there is no pressing on any enquiry interface within 30s, the interface will return to 
its default status in 30s.

Figure 23

Figure 24

Figure 25

 

 

 

Summary of Contents for ShineVision

Page 1: ...ENERGY CO LTD No 12 Building Xicheng Industrial Zone Bao an District Shenzhen P R China 86 755 2747 1900 86 755 2749 1460 service ginverter com www ginverter com T F E W Operation Manual ShineVision G...

Page 2: ...hing operation 2 3 1 Currency symbol setting 2 3 2 Income coefficient setting 2 3 Basic Setting 2 3 3 CO2 coefficient setting 2 3 4 Date setting 2 3 5 Time setting 2 3 6 Temperature unit setting 2 3 7...

Page 3: ...3 seconds in full screen as shown in Figure 2 The red LED light flashes quickly twice 3 seconds later 0 5 second per time then release the up and down keys LED light will be on for a long time LCD wil...

Page 4: ...once the codes are successfully matched Figure 6 Figure 7 Figure 8 2 3 Basic Setting In the default interface press OK key for quite a while 3 seconds later the red LED flashes quickly twice and then...

Page 5: ...current system time Figure 14 Figure 15 Figure 16 after adjustment then the 6 of 0 163 will flash press Up or Down to adjust its value ranging from 0 to 9 and press OK to confirm after adjustment then...

Page 6: ...current temperature symbol And now the symbol stops flashing and the interface is restored to the status as shown in Figure 9 then flashes If there is no need to set temperature unit press Down to ent...

Page 7: ...igure 17 to 22 Figure 26 There are two modes in the third line one showing the generated energy generation revenue and CO2 emissions in the month and the other showing the total generated energy total...

Page 8: ...display is shown as Figure 28 to 30 after entering all channels The figures show the data of CH 01 channel the data of other channels are much similar and the only difference is that clock areas show...

Reviews: