6.5 Lightning Protection Grounding

In this solar system all the unloaded metal components and cases should be connected to 

the ground. 

Single inverter need grounding over a PE point, multiple inverters need connect all the 

inverter  PE  cable  and  solar  panels  shelves  to  the  same  grounding  point  to  achieve 

equipotential.

Figure 6.8

Figure 6.9

21

22

Note: 

Pay  attention  to  the  rain  at  the  grounding  wire  terminal  joint.  Do  not  expose  it 

directly to the air. The recommended torque value for tightening the screw is 25kgf.cm.

1>It is generally recommended to install lightning protection devices (generally referred 

to as lightning rods or lightning protection belts and down conductors at the top of 

the building) to prevent lightning from hitting the PV array. (Note1)

2>Lightning  protection  devices  and  down-conductors  and  related  equipment  in 

photovoltaic  systems  (including  photovoltaic  panels,  inverters,  cables,  power 

distribution equipment) shall maintain a safe separation distance S; Suggested value 

of S: According to the general 5 storey height (about 15m) building roof, S takes 2.5m 

enough,  this  distance  can  be  simplified  according  to  the  inverse  relationship  of  the 

floor height. (Note2)

3>The  lightning  down  conductor  and  the  equipment  ground  wire  eventually  sink  at  a 

total  ground  point,  but  the  two  cannot  share  the  wire.  That  is,  the  equipment 

grounding  wire  should  be  pulled  separately,  and  the  wire  diameter  requirement  is 

>6mm2 when the safety interval distance S is satisfied; (Note4)

4>Refer to GB/T 21714.3-2015 for the relevant design of the above lightning protection 

lightning receptor system.

Note1:

Refer  to  IEC  61643-32  <Low  Voltage  Surge  Protector  (SPD)  Part  32:  Surge 

Protectors  Connected  to  the  DC  Side  of  Photovoltaic  Devices—Selection  and  Use 

Guide>, Appendix C.

Note2:

Refer to GB/T 21714.3-2015 <Lightning Protection Part 3 _ Physical Damage and 

Life Danger of Buildings>, 6.3.1.

Note3:

Refer to 6.2.2 and 6.2.3 of IEC 61643-32.

Note4:

Refer to Chapter 7 and Appendix C of IEC 61643-32.

The  lightning  protection  measures  for  photovoltaic  systems  shall  be 
carried out in accordance with the corresponding national standards and 
IEC  standards.  Otherwise,  photovoltaic  devices  such  as  components, 
inverters and power distribution facilities may be damaged by lightning. 
In this case, the company does not carry out warranty and assumes any 
responsibility.

Photovoltaic panel

Inverter

Distribution 

Cabinet

SPD

Power grid

Lightning 

protection device

Grounding bar

1

2

3

4

Total grounding point

L

ig

h

tn

in

g

d

o

w

n

th

e

li

n

e

Equipment ground wire

Lightning down the line

Safety 

interval S

WARNING

Summary of Contents for MAC 15-20KTL3-XL

Page 1: ...75 A 00 SHENZHENGROWATTNEWENERGYTECHNOLOGYCO LTD No 28GuangmingRoad ShiyanStreet Bao anDistrict Shenzhen P R China T 86 755 27471942 E service ginverter com W www ginverter com Installation Operation...

Page 2: ...Description 3 1 Appearance 3 2 Size Dimensions 3 3 Nameplate 3 4 Working Principle 3 5 Inverter Storage 3 6 Grid Types 3 Product Introduction 4 Unpacking 5 Installation 5 1 Basic Installation Require...

Page 3: ...ounding 6 Electrical Connections 7 Debugging 7 1 Debug Inverter 7 2 Operating Mode 7 3 OLED Display and Touch Buttons 8 1 Remote Data Monitoring 8 2 Local Data Monitoring 9 1 Routine Maintenance 9 2 T...

Page 4: ...on Before installation please read through this manual any damage cause by improper installation Growatt reserve the right to disclaim any warranty Ensure that the MAC is not connected to a power supp...

Page 5: ...technician Burn Warning Do not touch a running inverter cause it generates high temperature on the case Protective Grounding Connect inverter to grounding bar Delay discharge Residual voltage exists...

Page 6: ...ce 3 2 Size Description Model Size unit mm Weight unit kg Width High Deep MAC series PV inverter 680 508 281 52 MAC series PV Inverter with packaging 730 650 350 60 Figure 3 1 6 5 Identification Descr...

Page 7: ...ircuit breaker F Grid 1 Do not unpack the Inverter and store it in a ventilation dry place 2 Keep the storage temperature at 25 60 and humidity at 0 95 3 A maximum of four inverters with package can b...

Page 8: ...he OLED display and maintenance work F To avoid inverter performance de rate due to the over heat please do not expose the inverter under direct sunlight G The installation humidity should be from 0 9...

Page 9: ...ury Do not place the inverter with its wiring and signal terminals at the bottom contacting with floor or any other object because the terminals are not designed to support the weight of inverter 1 2...

Page 10: ...not store inverter in area with flammable and explosive material Each inverter must install one AC breaker AC breaker is forbidden to share with other inverters It is forbidden to add load between inv...

Page 11: ...vent water ingress Notice Waterproof joints must be blocked with fireproof mud to prevent water ingress Before electrical connection please ensure the inverter DC switch is at OFF also disconnect AC s...

Page 12: ...5A 3 MAC 50KTL3 X LV 12 5A 4 12 5A 3 12 5A 3 MAC 60KTL3 X LV 12 5A 4 12 5A 4 12 5A 4 MAC 50KTL3 X MV 12 5A 4 12 5A 3 12 5A 3 MAC 50 70KTL3 X MV 12 5A 4 12 5A 4 12 5A 4 MAC 15 36KTL3 XL 12 5A 4 12 5A...

Page 13: ...Steps for installing the monitoring module Make sure is on the front side then insert the display and tighten the screws Figure 6 7 19 20 When multiple machines are connected in parallel two customers...

Page 14: ...ght Note2 3 The lightning down conductor and the equipment ground wire eventually sink at a total ground point but the two cannot share the wire That is the equipment grounding wire should be pulled s...

Page 15: ...2 Local Data Monitoring download the mobile app and log in to the monitoring interface to modify the communication address This operation is performed by a professional 1 Select Parameter Settings 2...

Page 16: ...enough power voltage 200VDC then the inverter will start automatically The intelligent control system of the inverter constantly monitors and adjusts the state of the system When the inverter detects...

Page 17: ...ed Set Date 2018 12 14 Set Time 12 30 30 Set Comaddr 1 Set Language English General Advanced Set Parameter Reset factory YES NO WideVolt Set WideVolt Set 1 2 3 Set OK The inverter is factory set to CQ...

Page 18: ...setting mode switch the language with a single touch and touch the setting twice to confirm the setting Set Language English English Chinese Set OK The default COM address is 1 continuous touch twice...

Page 19: ...inePhone Main interface 1 The center of the main interface shows the current power station name You can switch between different power stations in the account by clicking the invertedtriangle symbol 2...

Page 20: ...ve power set PF set inverter time set grid voltage high set grid voltage low The operation password is inverter date For example if the date of the day is April 18 2019 the password is inverter2019041...

Page 21: ...essary information then go back to login page input the registered username and password click login Figure 8 8 Figure 8 9 On the Plant page click on device list datalog add data logger enter the SN n...

Page 22: ...Figure 8 13 Figure 8 11 C View detailed data Click Plant device list MAX MID and the inverter list of the power station is displayed Double click on the inverter name in the list to display the detai...

Page 23: ...5678 If you have already connected you can click Skip to connect directly to the WIFI Figure 8 14 Figure 8 15 When viewing local monitoring you must keep the phone s wifi connected to the collector s...

Page 24: ...C Parameter configuration The parameter data of the equipment can be modified according to the usage D Intelligent detection Detailed and accurate view of the device s detailed data and status E Intel...

Page 25: ...me recording detection Inverter voltage and current quality can be observed in real time Figure 8 21 Figure 8 22 Figure 8 20 H One click diagnosis One button detection of power plant environment inclu...

Page 26: ...to be programming at last time Figure 8 23 Figure 8 25 Figure 8 24 Figure 8 26 2 Fault Recording Create a BCONFIG txt file under the root directory of the USB flash drive write down_fault insert the...

Page 27: ...ssible reasons or solutions Fan is blocked or the heat sink gathers too much dust it needs to clean the fan fan cover or heat sink Fan is damaged it need to replace the fan Poor ventilation of the ins...

Page 28: ...normal 2 If error message still exists contact manufacturer Warning 202 DC SPD function abnormal 1 After shutdown Check the DC SPD 2 If error message still exists contact manufacturer Warning 203 PV...

Page 29: ...ge still exisits contact Manufacturer Error 304 AC F Outrange 1 Restart inverter 2 If error message still exists contact manufacturer 9 2 2 Error Error 402 Output DC current too high 1 Restart inverte...

Page 30: ...50A 50A 50A 45A 45A 45A 45A 45A 45A 55A 55A 55A 55A 55A 55A 3 3 3 2 3 3 3 4 3 3 4 4 4 33300VA 44400VA 55500VA 66600VA 230V 400V 340 440VAC 50 60 Hz 45 55Hz 55 65 Hz 43 5A cos 1 48 3A cos 0 9 58 0A cos...

Page 31: ...APP USB YES Rs485 YES WIFI Option GPRS Option 4G Option General Data Dimensions W H D 680 508 281 mm Weight 52kg 0 99 0 8LG 0 8LD Efficiency Protection devices Interfaces Operating temperature range 2...

Page 32: ...kers Full load MPP voltage MPP voltage range Nominal voltage Start voltage Max DC voltage Max recommended PV PV power for module STC Input data Max output current AC grid frequency range Model Power f...

Page 33: ...0A 50A 55A 55A 55A 15000W 20000W 22000W 16600kVA 220VAC 22200kVA 220VAC 24400kVA 220VAC 127V 220V 101 6 139 7V 50 60 Hz 45 55Hz 55 65 Hz 39 4A 52 5A 57 7A 46 3A 58 3A 64 0A Nominal AC voltage range Ma...

Page 34: ...WIFI APP USB YES Rs485 YES WIFI Option GPRS Option 4G Option General Data Dimensions W H D 680 508 281 mm Weight 52kg 0 99 0 8LG 0 8LD Efficiency Protection devices Interfaces Operating temperature ra...

Page 35: ...tage Max DC voltage Max recommended PV PV power for module STC Input data Nominal output current AC grid frequency range Model MAC 36KTL3 XL MAC 25KTL3 XL MAC 30KTL3 XL Max output current Power factor...

Page 36: ...o OFF position 3 Wait at least 5 minutes until the internal capacitor discharge is completed 4 Disconnect the AC connector 5 Disconnect DC connector 6 Remove the inverter from the wall 7 Disposing of...

Reviews: