background image

10

4.2 Electrical Connection Procedures

4 Electrical Connection

Step 1 Connect grounding cable.
             It is recommended to fasten  
             grounding terminal and 
             grounding cable with M6 screw.

Step 2 Make power cables.

1

8

4.1 Preparation

PCS

Link-In

Link-Out

Item No.

PCS 1

PCS-RS485-B

2

PCS-RS485-A

3

GND-ISO

4

PCS=CANH

5

PCS=CANL

6

GND-ISO

7

PCS-WAKE-

8

PCS-WAKE+

Item No.

Link-
In

1

COM-CANH

2

COM-CANL

3

Encode-IN+

4

GND-ISO

5

Master-Select

6

GND-ISO

7

GND-ISO

8

WKP-OUT+

Item No.

Link-
Out

1

COM-CANH

2

COM-CANL

3

Encode-OUT+

4

GND-ISO

5

Slave-Last

6

GND-ISO

7

GND-ISO

8

WKP-OUT+

3. Press connecting part with a hydraulic clamp.

4. Tighten up sealing, sealing nut  and joint sleeve.

Step 3 Make network cables 

1. Strip cable sheaths for 15±0.5mm first. Insert sealing and

sealing nut along the cable.

Joint Sleeve Sealing

Sealing Nut

1. Strip cable sheaths for 20±0.5mm, with orange positive

cable and black negative cable. Insert sealing and sealing nut
along the cable as shown.

2. Insert the copper wires all into the joint sleeve.

Summary of Contents for GBLI 6532

Page 1: ...Date 2020 Version V 0...

Page 2: ...er Version Date 1 N A Chen Le Shen Zhengbin Li Bing Guo Yihao V1 0 2020 07 24 2 Added the icon read the manual before operating Updated the caution about the two pole breaker Wang Qian Shen Zhengbin G...

Page 3: ...or or moderate injury Symbol Description WARNING CAUTION Table of Contents 1 Safety 1 1 1 Warning Label 1 1 2 Precautions 2 1 3 Responses to Emergencies 2 1 4 Storage safety 3 1 5 Transportation Safet...

Page 4: ...on area Risk of electric shock Explosive gas Battery may leak corrosive electrolyte Battery is heavy enough to cause severe injury 1 Safety 1 1 Warning Label Do not reverse polarities Do not expose ba...

Page 5: ...is dangerous and must be handled with utmost care They are not usable for use and could pose a safety threat to people or property If battery is suspected to be damaged stop any operation and return...

Page 6: ...ests and Criteria and SN T 0370 2 2009 Part 2 Performance Test of the Rules for the Inspection of packaging for Exporting Dangerous Goods The battery is classified as class 9 dangerous goods and is su...

Page 7: ...2 2 Function Compared with normal batteries the battery is characterized with better charging and discharging performance longer cycle life and less self discharging loss The build in BMS can monitor...

Page 8: ...harging Current temperature refere to the cell surface temperature 10 0 21 3A 0 45 104 2A 45 50 85 3A 50 55 32A 9 Norminal Charging and Discharging powern 3 3KW 10 Short Circuit Current 2200A 4ms 11 M...

Page 9: ...Ground Wall Wall Ground 5 5 500 d 1200 90 500 d 1200 500 d 1200 It is recommended to build sunshade rain shelter to avoid direct exposure to sunlight and rain 3 2 Installation Required Tools Drill Cri...

Page 10: ...racket to wall Choose alloy drill bit with a diameter of 12mm and install it to a drill Drill in the spots that have been located in step 1 and have at least 60mm drilling depth Clean the soil and dri...

Page 11: ...ntil the notch locks limiting pin rotate the right latch leftward until the notch locks limiting pin too Leave a minimum clearance of 133mm before the front surface of battery In order to guarantee a...

Page 12: ...in the drill Drill two holes in the spots that have been confirmed in step 1 Keep the drilling depth as least 60mm Clean the soil and drive expansion tube into hole Move battery back to the place conf...

Page 13: ...GND ISO 5 Master Select 6 GND ISO 7 GND ISO 8 WKP OUT Item No Link Out 1 COM CANH 2 COM CANL 3 Encode OUT 4 GND ISO 5 Slave Last 6 GND ISO 7 GND ISO 8 WKP OUT 3 Press connecting part with a hydraulic...

Page 14: ...crimper 4 Connect RJ45 plug with joint sleeve and tighten up sealing sealing nut and joint sleeve 2 Network cable adopts standard 8 core cable Insert eight wires into RJ45 plug Ensure the color of wi...

Page 15: ...on Steps under Parallel Connection Step 1 Install battery If voltage difference is measured more than 1V the difference shall be adjusted to be less than 1V either by charging the battery with lower v...

Page 16: ...battery Batteries undergone less than 300 cycles are defined as new batteries WARNING 6 Power on off Battery 6 1 LED Indication There are many technical contents involved in the electrification proce...

Page 17: ...75 0 SOC 75 1 99 9 SOC 100 SOC Discharge Standby 100 75 1 75 0 50 1 50 0 25 1 25 0 0 LED Indicator light Status Description Dispaly Logics Battery Status Description Light Indication LED1 LED2 LED3 L...

Page 18: ...n 2 Press POWER button of any battery for two seconds and observe the LED indication on two panels 1 If RUN and SOC lights on both batteries turn on normal and the RUN lights on both batteries flicker...

Page 19: ...kage zip and decompress it 2 Enter BMS Installation package Volume double click setup exe and run it 3 Execute the default configuration until completing the installation Step 2 Make sure the battery...

Page 20: ...de file 4 Click Start to Upgrade 5 Upgrade succeeds when progress bar reaches 100 T 86 0755 2747 1942 E service ginverter com W www ginverter com Address No 28 Guangming Road Shiyan Street Bao an Dist...

Reviews: