4.4.2 System connection

Ø

Before installing in series, make sure that the voltage difference of the 

battery pack must be less than or equal to 0.5V.

Ø

When connecting the power line, it must be the same color terminal to 

connect and then use it together, otherwise there may be dangers such 
as short circuit on the side.

Ø

A DC circuit breaker has been installed in the High voltage controller, It 

is not recommended to install a DC circuit breaker between the battery 
system and the hybrid inverter system, If you want to install a DC circuit 
breaker, do not operate the DC circuit breaker with power on, otherwise 
the machine may be damaged. And then you need to purchase it yourself 
according to the following specifications:
    a. Voltage: 1000Vdc
    b. Current: 63A

Notice

4.4.2.1 System connection diagram

Fig 4.11: Single line installation 

Fig 4.12: Two lines installation

To PCS

Insert Plug

To PCS

Insert Plug

Fig

 

4

.

10 

The

 

battery

 

i

s

 

not

 

allowed

 

to

 

be

 

i

nstalled

 

in

 

t

he

 

running

 

state

and

 

all

 

the

 

RUN

 

lights

 

of

battery

 

modules

 

should

 

be

 

off

 

before

 

installation

.

To

 

ensure

 

system

 

security

do

 

not

 

forget

 

to

 

install

 

ground

 

wire.

Don

'

t

 

forget

 

to

 

connect

 

the

 

communication

 

plug

 

of

 

the

 

last

 

battery

 

pack

otherwise

 

it

will

 

cause

 

system

 

failure

.

Fig

 

4

.

11

 

Note

:

When

 

installing

 

in

 

two

 

rows

please

 

purchase

 

the

 

extended

 

serial

 

cable

extended

 

ground

cable

 

and

 

extended

 

communication

 

cable

 

between

 

the

 

two

 

rows

 

separately

.

Don

'

t

 

forget

 

to

 

connect the

 

ommunication

 

plug

 

of

 

the

 

last

 

battery

 

pack

otherwise

 

it

will

 

cause

 

system

 

failure

.

Note

:

4.4.2.2 Electrical wiring connection

A. BDC 95045-A1 (High voltage controller) wiring

Step 1: Insert the power cable into the corresponding port, then there is click sound 

indicating the connection is ok.

Step 2: Insert the communication cable into the "INV port" and "BMU port", and then 

tighten the communication terminal clockwise. INV communication port is used for 

communication connection with hybrid inverter, BMU communication port is used for 

communication connection with battery pack.

Ø

For a single cluster battery system, the “Link-in” and “Link out” port 

of the BDC 95045-A1 don't need to be connected, they are only used for 

parallel connection of the battery systems.

Ø

Please pay attention to the connector color when connection the 

power line. Only the same color of the connector could be connected 

together.

Ø

 To ensure system security, do not forget to install ground wire.

Ø

 This area is a restricted access area , which is explained below:

Ÿ

area accessible only to electrically skilled persons and electrically 

instructed persons with the proper authorization.

Ÿ

note 1 to entry

An electrically skilled person is a person with 

relevant education and experience to enable him or her to perceive risks 
and to avoid hazards electricity can create.

Ÿ

note 2 to entry

An electrically instructed person is a person 

adequately advised or supervised by electrically skilled persons to enable 

him or her to perceive risks and to avoid hazards which electricity can 

create.

Notice

Fig 4.13: BDC 95045-A1 Electrical wiring connection diagram

Summary of Contents for ARK 5.1-25.6XH-A1

Page 1: ...w Energy Co Ltd 86 755 2747 1942 www ginverter com T E W service ginverter com GR UM 242 A 00 ARK 5 1 25 6XH A1 High Voltage Battery System User Manual V1 0 4 13 F Building A Sino German Europe Indust...

Page 2: ...rements 4 2 Installation Required Tools 4 3 Installation Procedures 4 4 Electrical Connection About this Document This document describes the installation electrical connection operation commission ma...

Page 3: ...duct is shown as below Fig 1 2 Schematic diagram of power panel Location Port Function 1 POWER Wake up battery 2 INV Port for communication with hybrid inverter 3 Link in Battery system in parallel co...

Page 4: ...ery management units power and signal terminals and mechanical parts Compared with other battery systems it has better charging and discharging performance higher charging and discharging efficiency m...

Page 5: ...with liquids Safety 2 2 2 2 Operation Precautions Do not touch the battery system with wet hands Do not disassemble the battery system without permission Do not crush drop or pierce the battery pack...

Page 6: ...u touch the leaking electrolyte do as below immediately Inhalation Evacuate the contaminated area and seek medical help Eye contact Rinse eyes with flowing water for 15 minutes and seek medical help S...

Page 7: ...l damages Prohibit to pile up more than six battery pack There will be a drop in capacity during transportation and storage Transportation temperature is between 20 C to 45 C relative humidity 5 95 RH...

Page 8: ...system Drill Screw Driver Wrench Pencil Tap Measure Multimeter It is recommended to wear the following safety gear when dealing with the battery system Insulated Glove Safety Goggle Safety Shoes 4 3...

Page 9: ...s a row only one battery base is required and two rows are required two And the wall bracket is only used for wall installation The number of wall brackets are determined by the number of battery modu...

Page 10: ...Fig 4 9 Multiple battery installation process with wall mount 4 3 3 Floor Standing Installation Step 1 Choose an alloy drill with a diameter of 8mm and drill at least 50mm mounting holes on the wall C...

Page 11: ...nts front view Pin assignments front view BDC 95045 A1 communication interface MOD TL3 XH Hybrid inverter three phase interface Silk screen Terminal serial number Definition Silk screen Terminal seria...

Page 12: ...onnect the ommunication plug of the last battery pack otherwise it will cause system failure Note 4 4 2 2 Electrical wiring connection A BDC 95045 A1 High voltage controller wiring Step 1 Insert the p...

Page 13: ...ration Please stand on dry insulating objects and do not wear conductive material such as watches and necklace during operation Insulated tools should be used Do not contact any positions with potenti...

Page 14: ...ransport the battery pack or High voltage controller to the designated repair site Install new battery pack or High voltage controller based on procedure specified in Section 4 6 3 System Failure Info...

Page 15: ...ller to repair battery Technical Specifications7 7 1 ARK XH A1 high voltage system System Model ARK 5 1XH A1 ARK 7 6XH A1 ARK 10 2XH A1 ARK 12 8XH A1 ARK 15 3XH A1 High Voltage Controller Model BDC 95...

Page 16: ...tage battery packs Voltage after series Single phase power conversion system allows 2 7PCS battery modules in series its nominal voltage is 400V Three phase power conversion system allows 3 10PCS batt...

Page 17: ...ging to 650V of DC DC output Module side voltage and current is limited by DC DC circuit ARK 20 4XH A1 IFpP 41 150 102 1P16S 8S M 10 50 90 constant current 15A charging to 650V of DC DC output Module...

Page 18: ...licker green Protection Charge and discharge Over current hardware protection SOC indicates current remaining capacity t 1S RUN ALM light flicker green Ambient temperatur e over temperatur e alarm t 1...

Page 19: ...ilure protection t 1S RUN ALM light flicker red Main circuit failure protection t 1S RUN ALM light flicker red EEPROM fault protection t 1S RUN ALM light flicker red Front end chip failure protection...

Reviews: