25
Position
Description
A/B
PV modules
C
circuit breaker
D
Growatt Inverter
E
Energy meter
F
Utility grid
The AC wiring step:
1.
The grid connection is made using 3 conductors (L, N, and PE)
.
The AC wiring step:
2.
Uninstall the parts of the AC connection plug from the accessory bag.