WWW.gronomics.com
East Bethel, MN USA
763-753-7374
Install the eight 31” x 5-9/16” side rails (Item 2) into the
upper part of the slots between the corner posts and
slide down.
Side Rail Assembly
3
2
2
Install the four end side rails (Item 6, 5, 4 & 3) into the
upper part of the slots between the two corner posts
and slide down.
Remove the rubber caps from the post studs. Install a
stiffener plate (Item 8) on the top end rail as shown.
NOTE: May need to lift boards 3,4,5 & 6 slightly by
placing fingertips under board 6 to get the stiffener
plate in place.
Repeat procedure on the opposite end with the four
remaining end rails and stiffener plate.
End Rail Assembly
4
4
6
5
3
8
Install the 29-1/2” x 2-1/2” bottom center rail (Item 7)
with the tapered edges of the rail facing down.
Install the fabric liner into the Garden Wedge.
Soil Capacity: 4.8 Cubic Feet
Bottom Center Rail Assembly
5
7
Align the hole of the 4” x 4” post cap (Item 9) with stud
and tighten until the post cap makes contact with the
post. Do not overtighten.
Post Cap Assembly
6
Stud
9