background image

1

English

Installation

1. Remove the two screws (A1) from the fitting template (A), 

then remove the template, see fold-out page I, Fig. [1].

2. Turn the valve stem (B) clockwise to the 

OFF 

position.

3. Make sure the water supply is turned on at the service stop 

valves (C). Stop valves must be in fully open position (slots 
horizontal) for valve to function.

4. The adjustable hot water limit stop (D) is factory set at 

neutral position to give maximum outlet temperature, see 
Fig. [2] and [5].

Please refer to chapter 

"Maximum hot water limit setting"

 

for limiting maximum outlet temperature.

5. Install adapter (E) onto the valve stem (B), by placing the 

lever stop pin (E1) on top of the "Arrow" 

 (F) and tighten 

with screw (G), see Fig. [2] and [5].

6. Push cap (H) with drain hole facing down onto the plastic 

guide (I) by gently pressing the slotted section (I1) on the 
plastic guide, see Fig. [2].

7. Slide the escutcheon mounting base (J) over the cap (H) 

and tighten with screws (J1), see Fig. [3]. 

Do not use excessive force to tighten the screws.

8. Fit lever (K), secure by tightening the loosely fitted set 

screw (L) with 3mm allen wrench and insert plug (M),
see Fig. [4].

The pressure balancing valve is now ready for use.

Caution!

Do not lift the lever on the handle to operate this valve. 
This pressure balancing valve opens from cold to hot by 
turning the lever counterclockwise. 

If the pressure balancing valve is installed too deep, 

the 

fitting depth can be increased by 1" with an extension set, Part 
No. 47 344, see fold-out page II.

Maximum hot water limit setting

The adjustable hot water limit stop (D) is factory set in a 
neutral position (0), see Fig. [5].

On applications requiring to limit the valve opening from full hot 
position, the factory set adjustable hot water limit stop must be 
reset as described below.

1. Remove the factory set adjustable hot water limit stop (D), 

see Fig. [6].

2. Slide the adapter (E) onto the valve stem (B), by placing 

the lever stop pin (E1) on top of "Arrow" 

 (F), see Fig. [5] 

and fold-out page III, Fig. [7].

3. Turn the adapter (E) counterclockwise until the outlet water 

reaches the desired temperature and read the corres-
ponding number (1 to 10, see Fig. [5]) against the lever stop 
pin (E1).

4. Close the valve by turning the adapter (E) clockwise and 

remove the adapter (E), see Fig. [7].

5. Align the white mark (D1) on the limit stop against the 

number (1 to 10, see Fig. [5]) you have selected on the dial 
and slide the limit stop (D), see Fig. [8].

6. Proceed to item 5 in chapter 

Installation

.

Note:

The preset maximum temperature will change if the inlet 
temperatures change or the setting of the water heater 
thermostat is altered.

Winterizing the system

It is recommended that the 

"pressure balancing cartridge"

 

be removed from the valve casting if the system is to be shut 
off during the winter.

Maintenance

Check, clean and if necessary, replace parts. Grease with 
special valve grease.

Pressure balancing cartridge,

 see fold-out page III, Figs. [9] 

to [13].

1. Lever out plug (M) and loosen set screw (L) with a 3mm 

allen wrench, see Fig. [9].

2. Pull off lever (K).
3. Detach screws (J1) and remove escutcheon (J).
4. Shut off hot and cold water stops (C). The slots are vertical 

when the stops are in the off position, see Fig. [10].

5. Pull off cap (H), loosen screws (I2) and detach plastic 

guide (I), see Fig. [11]. 

6. Close the valve by turning the stem clockwise. Detach stop 

ring (N) and 

note position

.

7. Loosen the four corner screws (O1) and remove valve 

cover (O).

8. Pull the pressure balancing cartridge (P) out of the valve 

body noting the location of 

"H"

 and 

"C"

, see Fig. [12].

9. Remove the check valve inserts (R), see Fig. [13].

If the check valves are removed it is important to reinstall them 
with the O-ring facing away from the cartridge. If they are 
installed incorrectly no water will flow.

The pressure balancing cartridge (P) must be replaced as a 
complete unit.

Reassemble in reverse order. Ensure that the hot 

"H"

 and 

cold 

"C"

 markings are on the correct side. 

Be sure that the stop ring (N) is installed in the position noted 
in item 6.

Replacement parts

, see fold-out page II (* = special 

accessories)

Care

Instructions for care of this faucet will be found in the Limited 
Warranty supplement.

Reviews: