background image

2

English

Maximum hot water limit setting

The adjustable hot water limit stop (D) is factory set in 
a neutral position (0), see fold-out page I, fig. [6].

On applications requiring to limit the valve opening 
from full hot position, the factory set adjustable hot 
water limit stop must be reset as described below.

1. Remove the factory set adjustable hot water limit 

stop (D), see fold-out page III, fig. [7].

2. Slide the lever adapter (E) onto the valve 

stem (C), by placing the lever stop pin (E1) on 
top of "Arrow" (

), see fig. [8].

3. Turn the lever adapter (E) counterclockwise until the 

outlet water reaches the desired temperature and 
read the corresponding number (1 to 10) against the 
lever stop pin (E1).

4. Close the valve by turning the lever adapter (E) 

clockwise and remove the lever adapter.

5. Align the white mark (D1) on the limit stop against 

the number (1 to 10) you have selected on the dial 
and slide the limit stop, see fig. [9].

6. Proceed to item 5 in page 1 to install the trim parts.

Note:

The preset maximum temperature will change if the 
inlet temperatures change or the setting of the water 
heater thermostat is altered.

Winterizing the system

It is recommended that the "Integral check pressure 
balancing cartridge"
 must be removed from the valve 
casing during the system shut off for winterizing.

Maintenance

Pressure balancing cartridge, see figs. [10] to [13]

   1. Separate lower rings (O) from lever (P), see 

fig. [10].

   2. Loosen set screw (P1) with a 3mm hex key.

   3. Pull off lever (P).

   4. Remove escutcheon (L) as shown in fig. [11].

   5. Remove screws (K1) and pull off mounting 

base (K), see fig. [10].

   6. Shut off hot and cold water stops (B),see fig. [12].

   7. Pull off cap (H), see fig. [13].

   8. Loosen screws (J2) and detach plastic guide (J) 

with sleeve. 

   9. Detach stop ring (R) and note position.

 10. Loosen the four corner screws (S1) and remove 

valve cover (S).

 11. Pull the existing pressure balancing cartridge (T) 

out of the valve body noting the location of "H" 
and "C" marking near the cartridge inlets.

The pressure balancing cartridge (T) must be replaced 
as a complete unit.

Check, clean and if necessary replace parts.

Reassemble in reverse order. Ensure the two 
alignment pins (T1) on the rear of the pressure 
balancing cartridge are properly seated in the 
holes (Z) of the valve body and that the hot "H" 
and cold "C" markings are on the correct side. 

Be sure that the stop ring (R) is in the marked position.
Check, clean and if necessary, replace parts.

Grease with special valve grease (Cat. No. 18 012)

Only

 

original GROHE replacement parts may be 

used.

Replacement parts, see fold-out page II (* = special 
accessories)

Care

Instructions for care of this Pressure Balancing Valve 
will be found in the Limited Warranty supplement.

977671.book : I97767us.fm  Seite 2  Montag, April 19, 1999  4:04 PM

Summary of Contents for Europlus 19 716

Page 1: ...p gina 3 English Fran ais Espa ol page 1 page 2 19 716 97 767 131 M 21 848 04 99 Europlus p gina 5 English Fran ais Espa ol page 1 page 3 977671 book t97767 fm Seite 1 Montag April 19 1999 4 04 PM...

Page 2: ...ttre cette instruction l utilisateur de la robinetterie Sirvanse pasar ese instrucci n al utilizador de la grifer a Please pass these instructions on to the end user of the fitting 6 D 2 C E G H E1 D...

Page 3: ...II 19 716 35 210 35 214 35 215 35 216 kl977671 fm Seite 2 Montag April 19 1999 4 11 PM...

Page 4: ...he fitting template A then remove the template see fold out page I fig 1 2 Make sure the water supply is turned on at the service stop valves B Stop valves must be in fully open position 3 Turn the va...

Page 5: ...tem shut off for winterizing Maintenance Pressure balancing cartridge see figs 10 to 13 1 Separate lower rings O from lever P see fig 10 2 Loosen set screw P1 with a 3mm hex key 3 Pull off lever P 4 R...

Page 6: ...admission d eau est en service aux robinets d arr t B Ceux ci doivent tre enti rement ouverts 3 Tourner la tige de robinet C sur la position OFF dans le sens des aiguilles d une montre voir fig 2 4 L...

Page 7: ...hivernisation Maintenance Cartouche d quilibrage de pression voir fig 10 13 1 D monter les joints inf rieurs O du levier P voir fig 10 2 D visser le tube filet P1 avec une cl Allen de 3mm 3 Retirer l...

Page 8: ...llaves de paso B est n abiertas Las llaves de paso tienen que estar completamente abiertas 3 Gire el v stago C de la v lvula en el sentido de los punteros del reloj hacia la posici n OFF ver fig 2 4 E...

Page 9: ...tucho compensador de presi n integrado Mantenimiento Cartucho compensador de presi n ver figs 10 a 13 1 Separe los anillos inferiores O de la palanca P ver fig 10 2 Aflojar el tornillo prisionero P1 c...

Page 10: ...III 7 D 11 L 9 D1 8 E C E1 P O P1 L K K1 3 m m 10 13 H J J2 R S S1 T T1 Z 12 B B 977671 book kr97767 fm Seite 7 Montag April 19 1999 4 04 PM...

Page 11: ...977671 book notizen fm Seite 8 Montag April 19 1999 4 04 PM...

Page 12: ...l Services Phone 630 582 7711 Fax 630 582 7722 Grohe Canada Inc 1230 Lakeshore Road East Mississauga Ontario Canada L5E 1E9 Technical Services Services Techniques Phone T l 905 271 2929 Fax T l copieu...

Reviews: