Grohe BauLoop Manual Download Page 5

4

English

Application 

Operation is possible in conjunction with:
- Pressurized storage heaters
Operation is 

not

 possible with:

- Low-pressure storage heaters 

(displacement water heaters)

Technical data 

• Max. flow

  

- Spout

approx. 28 l/min or 7.2 gpm/45psi

- Handshower

max. 9.5 l/min or 2.5 gpm/45psi

Flow pressure   
-  min.                                       

7.25 psi

-  recommended                         

14.5 - 72.5 psi

-  greater than 72.5 psi, fit with pressure  reducing valves

Max. operating pressure                      

145 psi

Test pressure                                

232 psi

Temperature    
- max. (hot water inlet)                      

176 

°

F

- Scalding protection possible by fitting a handle rotation 

stop (see replacement page 2, order no. 46 375).

  Water connection   

cold - Right hand

hot - Left hand

Notes

• Installation of backflow protection must comply with local 

codes and regulations.

• An access panel must be provided for access to diverting 

unit and hose connections.

• Major pressure differences between cold and hot water 

supply should be avoided.

Installation

Layout dimensions to establish centers and proper clearences, 
see dimensional drawing page 1.

Flush piping system prior and after installation of faucet 
thoroughly! 

Installing faucet body, 

see fig. [1].

1. Fit faucet body (A) with mounting set (B).
2. Fit adapter (C).

Spout,

 see fig. [2].

1. Place the O-ring (D1) on the tub deck and insert the 

spout (D) from above.

2. Secure the spout with the mounting set (E). 

3. Install the diverter (F) to the spout, gently guiding the lift rod 

assembly (G) up through the center of the spout (D).

4. Tighten the lift rod knob (H) to lift rod assembly (G).

Handshower,

 see fig. [3] and [4].

1. Install the escutcheon (J) onto the guide (K), see fig. [3].

2. Install the guide (K) through the mounting surface, insure 

the escutcheon washer (K1) is in place.

3. Secure with mounting set (L).

4. Insert shower hose (M) through guide (K) from below.

5. Screw tapered nut (N) onto shower hose (M).

6. Insert seal (N1) into the tapered nut (N) and screw hand 

shower (O) into tapered nut (N).

7. Install shower hose (M) with hose (P), see fig. [4].

Connect the faucet, 

see fig. [4] and [5].

The hot water supply should be connected on the left, the cold 
water supply on the right side.

Insure the supplied washers are used for all connections.

Open cold and hot water supply and check connections 
for leakage!

Operation

- Lever

Pull lever

= open (water flow)

Press lever down

= closed

Turn lever right

= cold water

Turn lever left

= hot water

- Diverter

Pulling the lever will release water supply.

Water will emerge from the bath spout first.
Pull diverter knob

= to divert flow from bath spout to 

shower outlet

Press diverter knob

= to divert flow from shower outlet to 

bath spout

Flow is diverted automatically from shower outlet to bath spout 
when the mixer is turned off.

Maintenance

Inspect and clean all parts, replace as necessary and grease 
with special grease.

Shut off cold and hot water supply!

I. Replacing the cartridge, 

see fig. [6].

1. Lever out plug (Q).
2. Loosen set screw (Q1) with 3mm allen wrench and pull off 

lever (R).

3. Unscrew cap (S).
4. Remove screws (T).
5. Replace complete cartridge (U).
Assemble in reverse order.

Observe the correct installation position.

Make sure that the cartridge seals engage in the grooves on 
the housing. Fit screws (T) and tighten 

evenly and 

alternately

.

II. Check valve,

 see fig [4].

1. Disconnect hose (P).

2. Remove check valve (V).

Assemble in reverse order.

III. 

Unscrew and clean 

flow control (13 905), 

see page 2.

Replacement parts,

 see page 2 ( * = special accessories).

Care

Instructions for care of this faucet will be found in the Limited 
Warranty supplement.

Summary of Contents for BauLoop

Page 1: ...English 1 Fran ais 2 Espa ol 3 Design Quality Engineering GROHE Germany BauLoop BauLoop 99 568 031 M 219653 07 11 19 592 English 4 Fran ais 6 Espa ol 8...

Page 2: ...I S v p remettre cette instruction l utilisateur de la robinetterie Entregue estas instrucciones al usario final de la grifer a Please pass these instructions on to the end user of the fitting 1...

Page 3: ...II 2...

Page 4: ...3 4 P M 19mm 24mm 29mm 24mm V 29mm B A 16mm 17mm 1 10mm C 5 E D F 2 G 41mm 36mm H D1 6 Q Q1 R S T U 3m m 3 M L K1 K J N N1 O 8mm 32mm 13mm...

Page 5: ...insure the escutcheon washer K1 is in place 3 Secure with mounting set L 4 Insert shower hose M through guide K from below 5 Screw tapered nut N onto shower hose M 6 Insert seal N1 into the tapered nu...

Page 6: ...5 4 P M 19mm 24mm 29mm 24mm V 29mm B A 16mm 17mm 1 10mm C 5 E D F 2 G 41mm 36mm H D1 6 Q Q1 R S T U 3m m 3 M L K1 K J N N1 O 8mm 32mm 13mm...

Page 7: ...en passant par le bas 5 Serrer le raccord conique N sur la fixation de douche M 6 Ins rer le joint N1 sur le raccord conique N et serrer la douchette O sur le raccord conique N 7 Poser la fixation de...

Page 8: ...7 4 P M 19mm 24mm 29mm 24mm V 29mm B A 16mm 17mm 1 10mm C 5 E D F 2 G 41mm 36mm H D1 6 Q Q1 R S T U 3m m 3 M L K1 K J N N1 O 8mm 32mm 13mm...

Page 9: ...ntroducir la junta N1 en la tuerca en forma de cono N y enroscar la teleducha O en la tuerca en forma de cono N 7 Montar el flexo de la teleducha M con el tubo flexible p v ase fig 4 Conectar el monom...

Page 10: ......

Page 11: ......

Page 12: ...ga Ontario Canada L5E 1E9 Technical Services Services Techniques Phone T l 905 271 2929 Fax T l copieur 905 271 9494 Grohe America Inc 241 Covington Drive Bloomingdale IL 60108 U S A Technical Service...

Reviews: