OM-HY-12E/24E
9
B. Initial Start-Up
After your Steamer has been installed, test it to see that
each cavity is operating correctly.
1. Remove literature and packing materials from
inside and outside the unit.
2. Make certain that the water supply line is open.
2. Turn on electrical power to the unit.
3. Press the Power ON/OFF touch pad (“ON” switch
on older models). The steam generator will fill with
water.
NOTE
: The door must be closed for the main (high)
heater to work.
4. Within six to 10 minutes the READY indicator light
should come on. This indicates that the water has
reached the standby temperature (near boiling).
When the READY light is displayed, the operator
may take any of the following steps:
a. Set the timer to the time desired for timed
steaming.
b. Turn the timer knob to the ON position for
continuous steam.
c. Allow the unit to remain at standby temperature
until needed.
WARNING
WHEN YOU OPEN THE DOOR STAY AWAY
FROM STEAM COMING OUT OF THE UNIT. THE
STEAM CAN CAUSE BURNS.
5. To shut down the unit, press the ON/OFF touch pad
(turn the ON switch to the OFF position on older
models). The steam generator will drain
automatically.
If the Steamer works as described, it is working
properly, and is ready for use.
9
OM-HY-12E/24E
9
Summary of Contents for HY-12E
Page 16: ...16 OM HY 12E 24E PARTS LIST HY 12E...
Page 18: ...18 OM HY 12E 24E WIRING DIAGRAM HY 12E...
Page 22: ...NOTES 22 OM HY 12E 24E 22...
Page 23: ...23 OM HY 12E 24E NOTES...