OM-HY-3E(CE)
5
The equipotential terminal is located on
the left rear of the HY-3E
Electrical connections.
Installation
1.
Power Supply
The HY-3E HyPerSteam™ CE model convection steamer operates at 400 Volts (Three Phase) or 230
Volts (One Phase).
ELECTRICAL SUPPLY CONNECTION REQUIREMENTS
Unit
Maximum KW
Field Wiring
Current Demands
400 Volt - 3 Phase
8
14 AWG
13 Amps
230 Volt - 1 Phase
8
8 AWG
20 Amps
a.
Connect the appropriate wiring as described in wiring diagram located on inside of right side panel.
HY-3E(CE) incoming power connections are shown below:
b.
Equipotential terminal - In accordance with national regulations the unit has been fitted with an
equipotential terminal.