Model G0714 (Mfd. Since 05/22)
-19-
11. Install remaining (8) M8-1.25 x 20 hex bolts,
8mm flat washers, and 8mm lock washers
into holes in leg flanges shown in
Figure 14.
12. Close and latch door. With help of assistant,
tilt blast cabinet upright onto its legs.
13. Place work tables into cabinet, so work table
with corner cut off is positioned at front-right
corner of blast cabinet.
14. Route blast gun hoses past notch in right
table, and hang blast gun on its hook on right
side of cabinet wall, as shown in
Figure 15.
Figure 14. Final leg installation.
16. Connect foot valve output line to fitting located
on front-right of hopper shown in
Figure 17.
17. Position foot pedal (see Figure 17) between
legs. Fasten it to floor, if desired.
Figure 16. Regulator installation.
15. Fasten pressure gauge and regulator "L"
bracket (see
Figure 16) to left-front leg using
(2) M6-1 x 12 cabinet screws and M6-1 flange
nuts.
Figure 15. Blast gun stowage.
Blast Gun
and Hook
Figure 17. Foot valve installation.
Hopper
Bulkhead
Fitting
Foot Valve Output Line
18. Locate dust collector canister assembly and
unlatch dust collector motor, lift dust collector
out of canister, and set it aside.
Summary of Contents for G0714
Page 48: ......