-8-
Model G0594 (Mfg. Since 7/11)
Inventory (figure 3)
Qty
A. Chipper/shredder ....................................... 1
b. wheel assembly ......................................... 2
C. hopper ........................................................ 1
D. Funnel ......................................................... 1
E. hopper gasket ........................................... 1
f. handles ...................................................... 2
G. leg ............................................................. 1
H. toolbox (Contents Not shown) ................... 1
—Ear protection ..................................1 pair
—safety goggles ................................1 pair
—gloves ..............................................1 pair
—oil Funnel ............................................... 1
—straight Blade screwdriver ..................... 1
—wrench 13/15mm .................................... 1
—wrench 12/14mm .................................... 1
—spark plug socket w/handle
5
⁄
8
" ............. 1
Hardware (Not Shown)
Qty
•
hex Bolts M8-1.25 x 35 .............................. 4
•
rubber grommets ...................................... 4
•
phillips head screws M8-1.25 x 35 ........... 4
•
Fender washers 8mm ................................ 4
•
lock Nuts M8-1.25 ................................... 11
•
Flat washers 8mm ................................... 27
•
lock washers 8mm ................................. 11
Assembly
the major components of this chipper/shredder
have been assembled at the factory. some minor
assembly is required. the assembly process will
use all the parts and hardware listed in the inven-
tory.
do Not attempt to start this machine until all
assembly has been completed. serious personal
injury and damage to the machine could occur.
to assemble the chipper/shredder:
1. tip the chipper/shredder over and remove
the four bolts shown in
figure 4. do Not
turn the chipper/shredder over once it is full
of oil and gas. the oil and gas will spill out.
2. attach the wheel assembly and the leg with
the bolts that were removed in
Step 1.
3. set the chipper shredder upright and set the
hopper gasket around the chute as shown in
figure 5.
figure 4. leg attached.
figure 3. Model g0594 inventory.
a
B
C
d
E
F
g
h
leg
leg Bolts
wheel
assembly
Bolts
Inventory
The following is a list of items shipped with your
machine. Before beginning setup, lay these items
out and inventory them.
If any non-proprietary parts are missing (e.g. a
nut or a washer), we will gladly replace them; or
for the sake of expediency, replacements can be
obtained at your local hardware store.