background image

GRIPPLE INC.
1611 EMILY LANE
AURORA, IL 60502 USA
Phone: 1-630-406-0600

www.grippleseismic.com

DATE:
3/14/2013

PAGE: 
2 / 2

GRIPPLE

®

 SEISMIC  

CABLE BRACING INSTALLATION GUIDE

(READ INSTRUCTIONS IN THEIR ENTIRETY BEFORE STARTING INSTALLATION) 

30º- 60º

30º- 60º

Run direction

Hanger rod with stiffener 

30º- 60º

40º - 50º

Run direction

TRANSVERSE BRACING:

NOTES:

Follow the instructions to install the two 

seismic braces.

Tighten cables to remove slack.

Ensure that the cables are in-line with each 

other, and in a plane perpendicular to the 

service they are bracing.

‘4-WAY’ BRACING:

NOTES:

Follow the instructions to install the  

four seismic braces.

Tighten cables to remove slack.

Two braces are anchored onto each  

rod, as shown here.  The brackets  

must be double stacked as detailed 

above.

DOUBLE STACKING:

Gripple Seismic Brackets can be 

double stacked as shown.  

Ensure that each bracket is in line 

with its respective cable brace.  

Up to four brackets can be 

stacked at one point on rod.  It 

is advised that no more than two 

brackets are stacked at an anchor 

point to the structure.

MAX SYSTEM DESIGN STRENGTHS (LRFD):

LRFD:

350 lbs

(158 kgs)

1,050 lbs

(476 kgs)

2,100 lbs

(952 kgs)

3,850 lbs

(1,746 kgs)

BRACE SIZE:

GS10

(5/64” cable)

GS12

(1/8” cable)

GS19

(3/16” cable)

GS25

(1/4” cable)

COLOR CODE:

Reviews: