MEK-PM
GRIP GmbH Handhabungstechnik Tel.: 0231/96450-01 www.grip-gmbh.com [email protected]
MBA-MEK-PM-EN
07/2019
Assembly and Operating
Manual
1
GRIP GmbH Handhabungstechnik
Alter Hellweg 70
44379 Dortmund
Tel. +49 231 96450 01
Fax +49 231 96450 50
www.grip-gmbh.com
Dear customer,
We are pleased that you have chosen a product
from our company.
Please follow the instructions in this manual to
avoid mistakes and save time.
In case you need further information or you have
further requests we will be glad to be at your
disposal.
With best regards
Your GRIP GmbH
Multi energy coupling (with radial pneumatic connections)
Contents
Page
1
Operation
1
2
Safety
2
2.1
Symbol
2
2.2
Intended use
2
2.3
Environmental and operating conditions
2
2.4
Safety indication
2
3
Warranty
2
4
Scope of delivery
2
5
Technical data
2
6
Assembly
3
7
Maintenance and care
3
7.1
Disassembly
3
7.2
Bolting torque
3
7.3
Compressed air connection
4
8
Object list
4
8.1
Spare and wear parts
4
9
Exploded view
5
10
EC-Declaration of incorporation
6
1 Operation manual
The upper part of the MEK is mounted on the upper part of the MGW or SWS, the lower part of
the MEK corresponding to the lower part. The mechanical connection of two components by
means of a change system is extended by the MEK, now the pneumatic and electrical lines are
coupled or decoupled parallel. Time-intensive disconnection of cables and hoses is no longer
necessary.
Pneumatic and electrical connectors are integrated in both halves, which are specially designed
for frequent plug connections and low joining forces. The MEK are graded in sizes according to
the GRIP change systems. On the MEK-PM variant, the pneumatic feedthroughs are radially
outgoing, equipped with metric threaded connections.