7
CAUTION
The operator
must
:
•
be connected via an approved electrical isol
a�
on device
•
be connected via a suitable circuit breaker that disconnects all live conductors
•
be connected in accordance with the wiring rules of the country in which it is installed
•
not have control enclosures l
e�
open for extended periods (excess dust will void warranty)
It is recommended to run all cable through non
-fl
exible conduit and use appropriate conduit entries.
However if a
fl
exible cable and cable gland are used, addi onal ca
ble �
es / strain relief must be
fi�
ed inside the enclosures to pre-
vent the cable from slipping.
Electrical
Connec�
ons
Motor connec on
3 phase
CAUTION
When Securing the Heavy Duty Operator with the 4 x ½’ x 1 ¼’ long fasteners (based on a 12mm
moun�
ng plate) and spring
washers provided, it is
cri�
cal to ensure that the applied torque is between 80-90Nm. When mou
n�
ng through thicker se
c�
ons,
ensure a minimum of 20mm of screw thread is engaged with the female thread. Use of incorrect fasteners or torque may cause
serious product damage and/or personal injury. When
fi
xing through a sl
o�
ed plate, ensure that the slots are no wider than
14mm as a spring washer may not be adequate in outside diameter to support the hexagon head.
INSTALLATION
For compliant
installa�
ons we recommend using the
Li�master GLMe2HS controller.
For
connec�
on details and user
instruc�
ons refer to the GLMe2HS manual.
COMPATIBLE LOGIC CONTROL