background image

 

gO Measurement-System User Manual 

 

6 / 8 

 

 

green

TEG

 AG 

 

Technoparkstrasse 1

 

8005 Zürich, Switzerland

 

 

T: +41 44 632 04 20

 

F: +41 44 633 13 68

 

 

[email protected]

 

greenTEG.com

 

 

The second page is the Report. 

The report tools can be accessed by clicking on “Report” in the menu on the left

-hand side. 

On the  upper  left side of the  report  page one can  select the desired data analysis tool that can be one of the following: 

“U

-value 

calculator”, “AW (humidity) calculator”

 or 

“Raw Data export”

The design of the U-value calculator is shown in Figure 7. In both tools (U-value and AW calculator) the data gets refreshed 
automatically and in real time. To analyze the data, one has to select a time period which contains the desired measurement, 
select a base station, a measurement start and the desired node pairing (one inside node and one outside node). By clicking 

“Apply” the

 measurement data gets processed and a U-value (or AW-value) is calculated. In the U-value calculator it is also 

verified if the measurement fulfills the ISO 9869 conditions. If needed, the data can be downloaded 

by clicking the “Export to 

CSV” butto

n. The AW-value calculator works the same way. 

 

 

Figure 7: U-value calculator view 

The “raw data export” tool 

allows the download of all the measurement data of one node.  

 
 

 

 

Summary of Contents for gO Measurement-System

Page 1: ...Status 07 05 2018 Version 1 1 User Manual for gO Measurement System...

Page 2: ...Status 07 05 2018 Version 1 1...

Page 3: ...greenTEG com greenTEG com 1 Delivery overview gO Measurement System 1 Base Station 1 to 6 Nodes of Type 1 2 or 3 1 Power Supply 2 to 6 Sensor Clips 48 double sided adhesive tapes medium 24 double sid...

Page 4: ...8005 Z rich Switzerland T 41 44 632 04 20 F 41 44 633 13 68 info greenTEG com greenTEG com 2 Node and base station at a glance Figure 2 Node left and base station right 1 LoRaSC connection indicator 2...

Page 5: ...s the connection is established the indicators color changes from yellow to green When the power button is pressed shortly the battery charging status can be seen If the node shouldn t connect to the...

Page 6: ...ct to the base station within 5min the node should be restarted and or relocated Figure 3 How to mount the node correctly left the sensor correctly middle and incorrectly right 2 5 After a successful...

Page 7: ...The online tool has two important pages The first page is the Dashboard where one can see the live measurement data for the base station and the nodes that are currently connected It helps you to chec...

Page 8: ...In both tools U value and AW calculator the data gets refreshed automatically and in real time To analyze the data one has to select a time period which contains the desired measurement select a base...

Page 9: ...e the print function from your web browser Since the webpage is too large to fit on a single A4 page one has to go through the following steps here Mozilla Firefox was used 1 Choose the measurement da...

Page 10: ...gO Measurement System User Manual 8 8 greenTEG AG Technoparkstrasse 1 8005 Z rich Switzerland T 41 44 632 04 20 F 41 44 633 13 68 info greenTEG com greenTEG com...

Page 11: ...o charge the base station and 2 hours to charge a node We suggest to not use cheap chargers as these are often not reliable and can lead to technical problems For additional chargers and power banks v...

Page 12: ...cases and items This document is not to be considered complete and is subject to change without prior notice In particular greenTEG assumes no liability for damages caused by the de installation of t...

Reviews: