
APPLIANCE INFORMATION
Greenstar Ri
ErP
- 6 720 813 283 (2015/07)
10
3.4
BOILER MAIN COMPONENTS
1
Air/Gas Manifold
15
Power and fault indicator (blue)
2
Sensor - Boiler flow
16
Wiring connections cover
3
Flow pipe
17
Burner indicator (green)
4
Return pipe
18
Boiler ON/OFF switch
5
Removable servicing panel
19
Condensate connection
6
Electrode assembly
20
Syphon / Trap
7
Overheat thermostat
21
Gas inlet connection
8
Silicon tube - Heat Exchanger air vent
22
Mains cable inlet
9
Heat Exchanger
23
Gas Valve
10
Flue overheat thermostat
24
Flue air pressure switch connection
11
Access panel - Heat Exchanger/Sump cleaning
25
Fan
12
Return connector with drain point
26
Manual vent point
13
Flow connector
27
Fan pressure test point
14
Boiler Temperature control and Reset knob
28
Air pressure switch
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
6720804541-01.1W
o
Summary of Contents for 12Ri ErP
Page 52: ...Greenstar Ri ErP 6 720 813 283 2015 07 52 NOTES...
Page 53: ...Greenstar Ri ErP 6 720 813 283 2015 07 53 NOTES...
Page 54: ......
Page 55: ......