Greenlee Textron / Subsidiary of Textron Inc.
13
4455 Boeing Dr., Rockford, IL 61109-2988 815/397-7070
555
®
Deluxe Electric Bender
Deduct Table
Scale Reading Table
SIZE
1/2
3/4
1
1-1/4
1-1/2
2
RIGID/PVC
7-1/2
9
11
14
14-1/4
16-1/8
DEDUCT
EMT
7
8-7/8
10-3/4
13-1/8
13-7/8
15-3/8
IMC
7-1/2
9
11
14
13-3/4
15-1/4
MINIMUM STUB LENGTH = DEDUCT PLUS 2 INCHES
Figures are approximate
RIGID
EMT
15
°
30
°
45
°
60
°
90
°
15
°
30
°
45
°
60
°
90
°
1/2
18-3/4
35
50
66-1/4 96-1/4 16-1/4 32-1/2 47-1/2 63-3/4
95
3/4
17-1/2 32-1/2 47-1/2 63-3/4
95
17-1/2 33-3/4 48-3/4 63-3/4
95
1
17-1/2 33-3/4 48-3/4
65
95
17-1/2 32-1/2 48-3/4
65
95
1-1/4 18-3/4 33-3/4 48-3/4 63-3/4
95
17-1/2 33-3/4 48-3/4
65
95
1-1/2 18-3/4 33-3/4 48-3/4
65
95
16-1/4 31-1/4 46-1/4 61-1/4 92-1/2
2
20
35
48-3/4 63-3/4 96-1/4 17-1/2 33-3/4 48-3/4 63-3/4
95
SIZE
IMC
PVC-Coated
15
°
30
°
45
°
60
°
90
°
15
°
30
°
45
°
60
°
90
°
1/2
20
36-1/4 51-1/4 67-1/2 98-3/4 17-1/2 33-3/4 48-3/4
65
95
3/4
20
36-1/4 51-1/4 67-1/2 97-1/2 17-1/2 33-3/4 48-3/4 63-3/4
95
1
21-1/4 36-1/4 51-1/4 66-1/4 97-1/2 17-1/2 32-1/2 47-1/2 63-3/4
95
1-1/4 18-3/4 33-3/4
50
65
96-1/4 18-3/4 33-3/4
50
65
95
1-1/2 17-1/2 33-3/4 48-3/4 63-3/4
95
18-3/4 33-3/4 48-3/4
65
95
2
20
35
50
65
96-1/4
20
35
48-3/4 63-3/4 96-1/4
SIZE
Figures are approximate
90
°
STUBS
1.
Measure the length of the required stub.
2.
See the Minimum Stub Length formula on the
Deduct Table. The required stub must be equal to
or longer than the Minimum Stub Length.
3.
Measure and mark the stub length on the conduit.
This is Mark 1. Subtract the Deduct from this mark
and make a new mark. This is Mark 2.
4.
Align Mark 2 with the front edge of the hook and
bend the conduit.
Notes:
When the operator presses “UNLOAD”, the conduit
may spring back a few degrees. Compensate by
overbending as shown in the Scale Reading Table.
The rigid shoe can make a 180
°
bend in one shot.
All other shoes bend to 90
°
maximum.
STUB LENGTH
DEDUCT
MARK 2
MARK 2
MARK 1
MARK 1
STUB LENGTH
Bending Instructions