Base Preperation
B
A
SOIL
100m
m
5 : 1
3’ X 2’ Slab
(910mm X 610mm)
2” thickness (50mm)
Recommended
C
M
I
90
o
P
A
B
C
D?
C
E
OPTIO
N 1 - S
lab Bas
e
OPTIO
N 2 - B
rick Pl
inth
For buildings larger than 12
foot long just add 620mm to
measurement ‘B’ for every 2
foot increase in size.
Base Preperation
For buildings larger than 12
foot long just add 620mm to
measurement ‘B’ for every 2
foot increase in size.
Summary of Contents for HE-HAS
Page 1: ...6ft Deep Extension Assembly Instructions Example 10 X 12 HE HAS...
Page 7: ...Add extra bolts for your louvre 916 916 300 916 576 916 947 304 304 945 948 945...
Page 9: ...927 309 915 915 333 309 915...
Page 11: ...909 909 909 490 304 916 912 916 916 588...
Page 12: ...695 909 916 588...
Page 13: ...695 910 588 588 588 6 924...
Page 14: ...304 913 912 916 909 910 588 924...
Page 15: ...914 910 924...
Page 16: ...912 945 913 916 910 909 588 Extension front 924...
Page 17: ...909 948 947 904 916 916 909 909 588 588...
Page 18: ...945 304 915 927 314 Main building gable Main building ridge...
Page 19: ...915 915 314 947 948 333...
Page 22: ...921 600 600 924 595 945 Clear Silicone...
Page 23: ...Return to the main instruction book section 5 page 16 Internal View 924...