Example
Section No.
Page No.
Thank you for purchasing your new Hercules greenhouse. We recommend you familiarise yourself with the instructions
and read all safety information before you commence assembly. This instruction manual is also available online at
www.greenhousepeople.co.uk
in our technical help section should you need to reprint it. Should you require any addi-
tional advice you can always call us on 01782 388811.
IMPORTANT:
PLEASE BE AWARE THAT THE YOUR GLAZING BARS (e.g. 916) / CORNER GLAZING BARS (e.g. 915) ALL NEED TO
HAVE RUBBER INSERTED INTO THEM BEFORE FRAME CONSTRUCTION CAN COMMENCE.
Safety Warning
Glass and aluminium can potentially cause injury. Please ensure you wear protective goggles, gloves, headgear and suitable
footwear when assembling and glazing the building.
Please remember that glass is fragile and should be handled with extreme care. Always clear up and dispose of any breakages
immediately.
Do not assemble the greenhouse in high winds.
For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a minimum of two people.
Please clear all lying snow from the greenhouse roof as it can cause the roof to buckle or collapse.
Site Preparation
When selecting a site for your greenhouse, it is vital that you choose as flat and level an area as possible.
A concrete or slabbed base will provide the most solid foundation for your greenhouse.
Avoid placing your greenhouse under trees or in other vulnerable locations.
To minimise the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedgerow or garden fence.
Additional Considerations
Please bear in mind that assembling your greenhouse can be time consuming. You may need to spread the construction over two
or more days. We recommend that you avoid leaving the building partially glazed. If you ever have to leave your greenhouse half
assembled and not anchored down, weigh it down with slabs or bags of sand to stop the wind moving it.
You will find it helpful to prepare a large, clean and clear area in which to work in. A garage floor or flat lawn area is ideal.
If you have arranged for someone to install your greenhouse for you, please check that all components are included. Most parts
are numbered and can be identified by a stamp or removable label. Alternatively, the components can be identified by lengths
detailed in the packing list (see diagram below).
Once installed your greenhouse requires little maintenance, but to maintain the smooth running of your door(s) WD40 or similar
can be applied to the door wheels and lower door guides.
Guarantee
Your new Hercules greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include
glass, moving parts, accidental damage or wind damage.
KEY
View Orientation
Potential Hazard
Wear safety
goggles
Wear gloves
Think/Decision
e.g.
Refer to section 4
Keep away
from water
while fitting
Cut/Trim
64
mm
512
Look out for part
numbers
Example
Summary of Contents for HE-HAS
Page 1: ...6ft Deep Extension Assembly Instructions Example 10 X 12 HE HAS...
Page 7: ...Add extra bolts for your louvre 916 916 300 916 576 916 947 304 304 945 948 945...
Page 9: ...927 309 915 915 333 309 915...
Page 11: ...909 909 909 490 304 916 912 916 916 588...
Page 12: ...695 909 916 588...
Page 13: ...695 910 588 588 588 6 924...
Page 14: ...304 913 912 916 909 910 588 924...
Page 15: ...914 910 924...
Page 16: ...912 945 913 916 910 909 588 Extension front 924...
Page 17: ...909 948 947 904 916 916 909 909 588 588...
Page 18: ...945 304 915 927 314 Main building gable Main building ridge...
Page 19: ...915 915 314 947 948 333...
Page 22: ...921 600 600 924 595 945 Clear Silicone...
Page 23: ...Return to the main instruction book section 5 page 16 Internal View 924...