INSTALLATION AND OPERATION
FOR:
VS.7.14
FOR: RAH–SAU Series
1
Page 1: ...INSTALLATION AND OPERATION FOR VS 7 14 INSTALLATION AND OPERATION FOR RAH SAU Series 1 INSTALLATION AND OPERATION...
Page 2: ...eference of the End User or Installer The following rules should be followed Place the Control Panel in a place where the outlet fog will not impinge on any surfaces Make sure to verify the air patter...
Page 3: ...vide humidifiers Utilize a t connector provided and taped to the RO system metal frame to hook up the product water blue line to the storage tank Locate the 2 5 gallon storage bladder proximity to the...
Page 4: ...Generator panel at the appropriately labeled locations on the terminals Refer to the Wiring Diagram provided with your unit for proper landing locations and line sizes Shielded control wire is recomme...
Page 5: ...ed to a drain Turning the System On go to the control panel and make sure the panel on off switch is off open up the control panel and make sure the circuit breaker CB is off if CB is showing green th...
Page 6: ...ith the system it should become active and show figures on it s display The should correspond to both the actual humidity level and the target set point humidity level Make sure their respective readi...
Page 7: ...turned off and verify that the Humidifier turns off as well as air flow stops b With the AC System back on if possible locate the HiLimit switch and lower its setting to as low as it can go The switc...
Page 8: ...xcessive continuous run time when humidifier is undersized or the space really needs more humidifiers but the customer elected not to furnish and install them If your model has a timer delay relay go...
Page 9: ...ure that the comes on Verify that the air flow switch has closed after properly sensing that air is moving in the duct Verify that the HiLimit switch circuit is closed Check the Wet Switch and verify...
Page 10: ...on when there is a call for humidification and not just when there is a call for heat There is a dry contact relay in the panel for exactly this purpose Contact the Installer to verify that he utilize...
Page 11: ...g sure all the UPC discs that should be running are indeed doing so You may do this by observing the operation with a flash light and peering through the plastic lid or taking the lid off see above in...
Page 12: ...12...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 17: ...17...
Page 18: ...18...
Page 19: ...19...
Page 20: ...120V 1PH Power On R 96 VA 7 6 UPC TANK 3 2 WET SWITCH 9 40 VA 10 WIRING FOR RAH SAU LAB UNIT WITH VECTOR CONTROLLER G Fog On Fill SV 2 11 A 17B Low Water CR3 NC WET SWITCH R WS 12B CR3 CR4 FLOAT SWITC...
Page 21: ...Idec Single Pole Relay 6048 Idec Single Pole Socket 6050 EMI RFI Fan Guard PARTS LIST Item Description 2 4 MHz Nebulizer Board Model 579R3 304SS with welds stand brackets top flange w PEMS and bottom...
Page 22: ...y or Factory Representative for current pricing Fan Guard for 4 69 Fan Bulkhead Conn 1 4T x 1 8MPT Brass Part B 400 11 2 clear w paper back in square ft units 10 Amp fuse 12 32 dia time delay 250 VAC...