©April 2017
Call Toll free at (800) 269-7130
CIR-UB7000-G1 Revision 1.2
27
John C. Jensen
PREVENTATIVE MAINTENANCE
Preventative Maintenance Schedule
Follow the schedule below to ensure proper operation of the product.
Number
Checking Item
Daily
Weekly
Monthly
Bi-Annually
Annually
1
Display Console
C
C
I
I
2
Console Mounting Bolts
I
3
Accessory Tray
C
I
4
Frame
C
I
5
Plastic Covers
C
I
6
Pedals and Straps
C
I
KEY:
C = Clean; I = Inspect
Hand pulse
Before/after running, to put your feet separately on each side rein,
then hold the hand grip, so as to avoid any shaking. If the heart beat
is too high or irregular, please have your hands out of the hand grip
until the pulse display returns to " 0 ", then redoing the test.
Don't do this test while running.