53
Installation and Maintenance
Service Manual
Remove the screws connecting the electric box
subassembly and the isolation sheet. Remove the
electric box subassembly.
Remove the screws connecting the right side plate
with the chassis, the valve support and the condenser
subassembly. Remove the right side plate
subassembly.
Unsolder the pipes connected to the compressor and
the condenser.Remove the suction pipe and the
discharge pipe.
(NOTE:Discharge the refrigerant before unsoldering)
6.Remove right side plate subassembly
5.Remove electric box subassembly
7.Remove suction pipe and discharge pipe
electric box
.
right side plate
suction pipe and
discharge pipe