24
Pressure Meter
Connection Pipe
Vacuum pump
Air-to-water Heat Pump
Note
when vacuuming is finished, pressure inside the unit should be kept lower than 80Pa for at least 30 minutes to
make sure there is no leak. Either charging valve 1 or charging valve 2 can be used for vacuuming.
Charging
: when vacuuming is finished and it is certain that there is no leak, charging can be done.
(1) Be sure to charge the specified amount of refrigerant in liquid state.
(2) Since this refrigerant is a mixed refrigerant, adding it in gas form may cause the refrigerant composition to
change, preventing normal operation.
(3) Before charging, check whether the refrigerant cylinder is equipped with a siphon tube or not.
With siphon tube
No siphon tube
15. Installation of Insulated Water Tank
15.1 Installation measure
The insulated water tank should be installed and keep levelly within 5m and vertically within 3m from the indoor
unit. It can be installed in the room.
Standing water tank must be installed vertically with the bottom on the ground, never suspended. Installation
place must be firm enough and the water tank should be fixed on the wall with bolts to avoid vibration, as shown in
the following figure. Weight capacity of water tank during installation should also be considered.
Water Tank
Fix
With
Bolts
Installed on the ground
and never suspended
The minimum clearance from the water tank to combustible surface must be 500mm.
There should be water pipe, hot water joint and floor drain near the water tank in favor of water replenishment,