Multi Variable Air Conditioners Floor and Ceiling Type Indoor Unit
11
Fig.4.1.3
4.2 Refrigerant Pipe Connection
(1) Aim the flaring port of copper pipe at the center of screwed joint and then tighten the
flaring nut with hand as shown in Fig.4.2.
(2) Tighten the flaring nut with torque wrench.
Fig.4.2
Torque for Tightening Nut
Pipe Diameter (mm)
Torque (N·m)
Φ6.35
15~30
Φ9.52
35~40
Φ12.7
45~50
Φ15.9
60~65
Φ19.05
70~75
(3) Use pipe bender when bending the pipe and the bending angle should not be too small.
(4) Wrap the connection pipe and joint with sponge and then tie them firmly with tape.
4.3 Drainage Pipe Installation and Drainage System Testing
4.3.1 Notice for Installation of Drainage Pipe
(1) It is not allowed to connect the condensate drain pipe into waste pipe or other pipelines
which are likely to produce corrosive or peculiar smell to prevent the smell from
entering indoors or corrupt the unit.
(2) It is not allowed to connect the condensate drain pipe into rain pipe to prevent rain
water from pouring in and cause property loss or personal injury.
(3) Condensate drain pipe should be connected into special drain system for air
conditioner.
(4) The drainage pipe should be short and the gradient downwards should be at least
1%~2% in order to drain condensation water smoothly.