1.Stick one sealing strip respectively on the left side and right side of flexible
screen installation frame, as shown in the figure.
Step 1: Install upper guide rail
upper guide rail
sponge
1. Tear off the paster at back side of sponge, and then align it at the bottom
edge of upper guide rail to stick the sponge at the bottom of upper guide
rail. (The sponge has been stick on the upper guide rail for some models.
Therefore, this step can be omitted.)
models. Therefore, this step can be omitted.)
Step 2:
、
“RIGHT”at both sides of air conditioner in turn. Slide the upper and lower ends
Installation procedure
2.
21