Ducted Type Split Air-Conditioner Units(Inverter Series)
8
2.3.3 Test of Drainage System
(1) Inject approximately 1L purified water to drain pan from air vent, ensure
that not to splash the water over the electrical components (e.g. water
pump. etc.).
(2) During the test, please carefully check the drainage joint, make sure no
any leakage occur.
(3) It is strongly recommend to do the drain test before ceiling decoration.
Fig.9
2.4 Installation of Air Duct
NOTES!
①
There should be insulating layer on air-out duct, return-air duct and fresh
air duct to avoid heat loss and moisture. Adhere a nail on the air duct and
then add thermal sponge with a layer of tin. Fasten it with a nail cover and
then seal the junction with tin tapes. You can also use other materials that
have good insulation quality.
②
Each air-out duct and return-air duct should be fixed on a pre-made
board with iron frame. The junction of air duct should be well-sealed in
order to prevent air leakage.
③
The design and construction of air duct should comply with national
requirements.
④
The edge of return-air duct is suggested to be more than 150mm away
from the wall. Add a filter to the return-air opening.
⑤
Please consider noise-damping and vibration damping for the design and
construction of air duct. Besides, noise source must be away from people.