
Great Plains
| 401-832M | 2018-07-31
36
YP1630F-1630 and YP1630F-1670
Operating Instructions
Related Topics
Fertilizer Unloading and Clean-Out
Swing-Down Railing Section
If fertilizer will be loaded via auger, from behind the
planter, the walkboard handrail height may be reduced
for auger tube clearance.
At each side, pull cross-pins
out and make
1
4
turn.
Release pin into shallow detents. Swing railing toward
hopper.
Auger height required is:
2.9 m (9 feet 6 inches):
Lid Opening
Keep lid closed. Keep tightly closed for operations. Keep
loosely closed for storage. Open only for material
loading, hopper clean-out and exceptional maintenance.
1.
Lift handle
.
Refer to Figure 31 and Figure 32
2.
Swing handle
out until hook
releases from
U-bolt.
3.
Move hook
clear of U-bolt and re-close handle.
4.
Lift lid slightly at pivot end to clear strainer
.
5.
Swing lid away from walkboard. Open only enough to
accomplish the present task.
6.
Check that the strainer basket
is clean and in
place.
Do not operate without a strainer:
It is an important safety feature that prevents accidental entry
into the hopper. It also prevents larger foreign matter from
clogging the meter and air system.
7.
Inspect the hopper to ensure that it is empty, and
free of foreign matter that could foul the meter.
2
1
Figure 30
3520 Liter Fertilizer Hopper
34448
Figure 31
Hopper Lid Unlatched
32455
3
Figure 32
Hopper Lid Opening
32456
4
5