YP625PD
Operating Instructions
33
06/12/2019
401-754M
Null4:
Null4:
Null4:
Null4:
Null4:
Null4:
Null4:
Null4.aac:
Null4:
Null4:
Mechanical Checklist (Hitching)
Page
Planter hitched
Safety chain secured to tractor
Parking jack stowed
Electrical Checklist
Page
Verify electrical hookups solid
Check seed monitor terminal and observe any
diagnostic messages
a
a. Refer to monitor manual.
Option: Verify that, when planter is lowered,
optional radar speed sensor is pointed at
ground, at an angle approximately 35
below
horizontal.
b
b. Refer to sensor documentation.
Hydraulic System Checklist
Page
Check tractor hydraulic reservoir full
-
Inspect connections for leaks
-
Perform a raise and lower operation
Check fan speed and airflow direction
a
a. Operate fan briefly. Observe rotor blades spinning toward
exit port as fan slows to a stop.
Mechanical Checklist (post-Hitching)
Page
Raise planter.
Disengage transport locks
Front-to-rear level
Marker extension set
Marker disc angle set
Markers folded (unless already at start of first
planting row)
Air System Checklist
Page
Fan butterfly valve set
Seed loaded. Lids closed.
Meter shutters open to chart value
No air leaks (except from seed hoppers)
Hoses and tubing - no sags, no pinches
Check both manifold and sensor lines
Hoses fully connected to meters
Planter Meter Drive Checklist
Page
Check chain lubrication and slack
Calibrate speed sensor pulses with planter
lowered.
a
a. Refer to seed monitor manual.
Seeding: Set/check Range and Transmission
against rate chart
b
b. Refer to Seed and Fertilizer Rate manual.
Row Units Checklist
Page
Preset depth handles alike.
Preset down force springs alike, except in tire
tracks.
Check closing wheel alignment
Set press wheels alike, except in tracks.
Check action and contact of side depth wheels
Check wheel scraper gaps (if installed)
Slide gates open
Fertilizer Checklist
Page
Uncouple drive shaft if no fertilizer is being
applied, otherwise …
Install correct DRIVING and DRIVEN sprockets
for desired fertilizer rate
a
a. Check Seed and Fertilizer Rate manual.
Check and adjust applicator tubes
Load fertilizer at field
Meters Checklist
Page
Corn?
Check timing of meters for twin-row or triple-row
a
a. Refer to Seed and Fertilizer Rate manual.
Check chain tension. Re-connect any loose
idler tensioning springs.
-
Correct disks for seed
Start fan. Operate at field manifold pressure.
Rotate meter drive shafts one turn disks with
seed.