NTA3010, NTA3510 and ADC
Air Drill Assembly 13
2022
-
04
-
14
160-220M
Gauge Wheel Arms to Wings
Start with the right-hand wing.
1. Check that the pivot bushings:
890-011C BUSHING SPINDLE 1 1/2X1 1/4X1
are in place in pivot tubes on the gauge-wheel arms.
2. At each wing clevis , drive out and save:
then remove and save two:
160-201H WING PIVOT PIN WELDMENT
3. Use forklift or hoist to move the gauge-wheel arm
NTA WING GAUGE WHEEL WLDMNT RH
to the front of the right-hand wing.
Determine which gauge-wheel arm is for the current wing by
looking at the cylinder lug on the wheel arm. When standing
behind the arm pivot tubes, the lug will be to the outside (right
of center for the right-hand wing, and left of center for left-
hand wing).
4. Align wing clevis and arm pivot tubes. When in
place, right-hand insert pivot pins and secure with
roll pins .
5. Repeat step 1 through step 4 for left-hand wing
gauge wheel arm:
NTA WING GAUGE WHEEL WLDMNT LH
Figure 7
Wing Gauge Wheel to Frame
16424
U
D
F
B
L
R
Cylinder
Lug to
Outside