2019-03-08
196-359M
3N-4010F, 3N-4010HDF, and 3N-4020F
Preparation and Setup
18
Marker Setup (Option)
If markers are not installed, install them now per the
instructions included with the markers.
Once installed, verify that they have been correctly bled
Set initial marker extension - the distance to the mark on
each side from the outside row unit on that side.
1. Move the hitched drill to a typical flat field.
2. Extend a marker on one side (see page 32). Pull
forward a few feet or a meter or so to leave a mark.
3. Measure from the centerline of the outside row unit
(whether that row unit is to be used or not) to the
mark, along a line parallel to the wing.
Refer to Figure 175 through Figure 180 on pages 126
4. Check the measurement against the value
recommended by Great Plains.
If the marker extensions need adjustment:
5. Loosen the nuts securing the U-bolt at the outer
marker section.
6. Slide the inner tube in or out, and re-secure nuts.
See page 68 for further marker adjustments. Re-check
marker extension when changing disk angle, or when
inverting the disk, as both adjustments change the
position of the centerline of the mark.
Shaft Monitor (Option)
1. Choose a tractor cab location where the module
does not obstruct vision, and the shaft indicators can
be easily seen if an alert sounds.
2. Route the power leads
to a source of +12 Vdc
power.
Color code is red+, black-.
3. Use a tie to secure the power lead.
4. Route the monitor harness
to the tractor hitch.
Use ties to secure the hitch lead.
For operation, see:
Shaft Monitor Operation (Option)
For ordering information, see:
Figure 12
Adjusting Marker Extension
18878
1
2
3
Figure 13: 823-060C
Shaft Monitor
28241
P
H
P
H