background image

Instructions for the following Great Lakes Racks and Accessories: 

VD4PM6-2436, VD4P1224-2436, VD4PHD-2436, 

CMR-45U16, CMR-45U

VSBK6-8, VSBK9-14, 4PBK24-36, 4PBK12, 4PBK16,

 

4PBSF24-36, 4PSPV24-36, PDU2ER, PDU3ER, 

VCM12-FO-ER, 4PLRBV4-8, ESF24-29, ESF16

Enhanced Rack Series

Installation Instructions

1-866-TRY-GLCC (879-4522)

WeRackYourWorld.com

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

A

A

B

B

C

C

D

D

DWG NO:

REV

SHEET:

OF

DRAWN

CHECKED & APP.

TITLE

DRAWING NOT TO SCALE

PART NUMBER:

QTY PER UNIT:

1

MATERIAL TYPE:

MATERIAL GAUGE:

FINISH:

GREAT LAKES CASE & CABINET CO., INC.

P.O. BOX 551 EDINBORO, PA 16412

PHONE (814) 734-7303 FAX (814) 734-3907

E-MAIL [email protected]

Use of this document is subject to
a confidentiality and nondisclosure
agreement with Great Lakes Case
& Cabinet Co., Inc. (GLCC) and may

not be reproduced, disclosed or

utilized in whole or in part without
prior written authorization from GLCC.

NOTICE:

TOLERANCE UNLESS OTHERWISE NOTED:

A/- 1

.XXXX +/- .010

.XXX +/- .015

.XX +/- .030

 .X FOR REF. ONLY

UNLESS OTHERWISE SPECIFIED

ALL DIMENSIONS ARE IN INCHES

DIMENSIONAL LIMITS APPLY

AFTER APPLICATION OF FINISH

INTERPRET DRAWING PER ASME Y14.5M-1994

THIRD ANGLE

PROJECTION

DATE

DATE

CaiusD

10/15/2013

 

 

 

Catalog Config

 

 

 

 

EST. WEIGHT : 

N/A

Summary of Contents for 4PBK12

Page 1: ...PART NUMBER QTY PER UNIT MATERIAL TYPE MATERIAL GAUGE FINISH Use of this document is subject to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be...

Page 2: ...operation and maintenance of the racks WARNING Failure to follow directions in the warning could result in injury to persons or loss of life BEFORE ASSEMBLY PLEASE SEE PAGE 27 FOR SAFTEY CONSIDERATION...

Page 3: ...FICATIONS Dimensions 84 H x 20 31 W x 24 36 D Rack Spaces 45 RMU Certifications UL Listed Construction VD4PM6 2436 and VD4P1224 2436 Vertical Uprights 12 ga steel Cross Members 14 ga steel Extension B...

Page 4: ...s the left and right side of the rack Follow the drawing to be sure that corresponding cross members are with the correct extension bars Top Rear Cross Member Left Variable Depth Side Rails Right Vari...

Page 5: ...CKED APP TITLE DRAWING NOT TO SCALE PART NUMBER QTY PER UNIT 1 MATERIAL TYPE MATERIAL GAUGE FINISH GREAT LAKES CASE CABINET CO INC P O BOX 551 EDINBORO PA 16412 PHONE 814 734 7303 FAX 814 734 3907 E M...

Page 6: ...1 2 13 x 1 lg Hex Cap Screw Vertical Upright Bottom Width Bracket Shown Toe Out Mounting 1 2 13 Hex Nut 1 2 13 x 1 lg Hex Cap Screw DETAIL A TOP BRACKET RAILS WITH M6 MOUNTING DETAIL B BOTTOM BRACKET...

Page 7: ...Vertical Uprights Rail Type 3 8 sq M6 mounting Total Max Load Capacity 2000 lbs 7 What s Included Component Qty Vertical Uprights 2 left 2 right 4 Rack Mounting Hardware 50 Width Brackets 4 Rack Asse...

Page 8: ...ASSEMBLY 1 The variable depth side rails are assembled by snapping together a cross member piece and extension bar Cross members and extension bars are specific to the top and bottom as well as the l...

Page 9: ...to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be reproduced disclosed or utilized in whole or in part without prior written authorization from...

Page 10: ...he GLCC label on top using 3 8 16 x 3 4 flat head screws Align the uprights so that the 1 on the RMU labels is toward the bottom DO NOT TIGHTEN 3 8 16 x 3 4 lg Flat Head T45 Screws 1 2 13 Hex Nut Vari...

Page 11: ...nstruction CMR 45U16 Upright Channels 11 ga steel Width Brackets 12 ga steel Cross Brace Waterfall Edge 12 ga steel Center Waterfall Bracket 16 ga steel CMR 45U Upright Channels 12 ga steel Width Brac...

Page 12: ...ht Channels Install 8 3 8 16 x 3 4 lg T45 screws FINGER TIGHTEN B Install Center Waterfall Brackets 2 to the Cross Brace with 1 12 24 Pan Head Screw per bracket thru the slots in the cross brace Must...

Page 13: ...Management Fingers Upright Channel Cross brace Waterfall Edge 3 8 16 x 3 4 lg Flat Head Screws T45 12 24 Pan Head Screw Cross brace Waterfall Edge Center Waterfall Bracket Cable Management Fingers 12...

Page 14: ...ead Bolts 4 3 8 External Tooth Lock Washers and 2 3 8 Hex Nuts on each channel FINGER TIGHTEN B Locate horizontal slots on the front Cross Brace Install Center Waterfall Bracket to the Cross Brace wit...

Page 15: ...Head Bolt Cable Ring 12 24 Pan Head Screw Upright Channel Horizontal Width Bracket Cross Brace Waterfall Edge 3 8 16 Hex Nut Center Waterfall Bracket 15 12 24 Pan Head Screw 3 8 16 x 1 lg Hex Head Bo...

Page 16: ...224 2436 and VD4PHD 2436 Racks and the Center Waterfall Bracket on the CMR 45U and CMR 45U16 If these parts need to be bonded to the protective earthing terminal do so in accordance with Article 250 o...

Page 17: ...ine the required spacing needed between racks Assemble the brackets by inserting the square tab into the correct hole of the opposite bracket push the brackets together so that the tab is inserted fir...

Page 18: ...e baffle to fit the next rack as shown in Detail B 3 Attach the other side of the baffle to the next rack by inserting six 12 24 x lg pan head screws Tighten the hex nuts OPTIONAL 4 Along the left and...

Page 19: ...the variable brackets normally the same depth as the end of row rack Set the brackets at the required depth and secure together by using two 10 32 nuts and washers 2 Bolt the variable depth brackets t...

Page 20: ...he flange of the side panels should be against the inside of the support frame Use 4 push button rivets to secure each flange to the support frame as shown in Detail B 3 Align the outer panel with the...

Page 21: ...the PDU and position of buttons on the PDU should be taken into consideration when installing the brackets A B C A B C PDU Bracket 12 24 Pan Head Screw Detail A Option 1 Outside Rail Detail C Option...

Page 22: ...N INCHES DIMENSIONAL LIMITS APPLY AFTER APPLICATION OF FINISH INTERPRET DRAWING PER ASME Y14 5M 1994 THIRD ANGLE PROJECTION PCS I020760 EST WEIGHT 246 81 lbmass A REVISION HISTORY REV DESCRIPTION DATE...

Page 23: ...en 2 racks racks will need spaced at 14 apart Attach the manager to the racks using 12 24 hardware supplied with rack 3 After cable manager is attached go back and tighten all hardware Detail B Top Le...

Page 24: ...i top does not need attached to base Detail A 2 Attach the bracket to the top of the rack as shown in Detail B FINGER TIGHTEN 3 Attach ladder rack to brackets as shown in Detail C 4 Tighten all hardwa...

Page 25: ...P TITLE DRAWING NOT TO SCALE PART NUMBER QTY PER UNIT 1 MATERIAL TYPE MATERIAL GAUGE FINISH GREAT LAKES CASE CABINET CO INC P O BOX 551 EDINBORO PA 16412 PHONE 814 734 7303 FAX 814 734 3907 E MAIL glc...

Page 26: ...ct to a confidentiality and nondisclosure agreement with Great Lakes Case Cabinet Co Inc GLCC and may not be reproduced disclosed or utilized in whole or in part without prior written authorization fr...

Page 27: ...heaviest equipment first at the bottom of the ER Rack and load the lighter units at the top Only UL Listed ITE Information Technology Equipment units should be installed inside the rack Be sure to rea...

Page 28: ...FORM MS 5 02 31 REV 3 ETSI Associate Member Thank you for your business...

Reviews: