When mounting to a cement floor, recommended mounting
hardware is Great Lakes Seismic Anchor Kit (AK101).
For other floor construction, the installer must provide all
appropriate hardware.
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
A
A
B
B
C
C
D
D
DWG NO:
REV
SHEET:
OF
DRAWN
CHECKED & APP.
TITLE
DRAWING NOT TO SCALE
PART NUMBER:
QTY PER UNIT:
1
MATERIAL TYPE:
MATERIAL GAUGE:
FINISH:
GREAT LAKES CASE & CABINET CO., INC.
P.O. BOX 551 EDINBORO, PA 16412
PHONE (814) 734-7303 FAX (814) 734-3907
E-MAIL [email protected]
Use of this document is subject to
a confidentiality and nondisclosure
agreement with Great Lakes Case
& Cabinet Co., Inc. (GLCC) and may
not be reproduced, disclosed or
utilized in whole or in part without
prior written authorization from GLCC.
NOTICE:
TOLERANCE UNLESS OTHERWISE NOTED:
A/- 1
.XXXX +/- .010
.XXX +/- .015
.XX +/- .030
.X FOR REF. ONLY
UNLESS OTHERWISE SPECIFIED
ALL DIMENSIONS ARE IN INCHES
DIMENSIONAL LIMITS APPLY
AFTER APPLICATION OF FINISH
INTERPRET DRAWING PER ASME Y14.5M-1994
THIRD ANGLE
PROJECTION
DATE
DATE
1
2
PCS
1/27/2014
I020734-TEST
EST. WEIGHT :
93.76 lbmass
Table
PART NO.
RAIL DEPTH
MTG. TYPE
VD4PM62436
24"-36"
CAGE NUT - METRIC 6
VD4P12242436
24"-36"
#12-24 TAPPED
Mounting Holes Ø.75
(Detail B - Bottom Width Brackets)
DETAIL A
(TOP BRACKET-RAILS
WITH M6 MOUNTING)
DETAIL B
(BOTTOM BRACKET- TOE OUT MOUNTING
- WITH M6 MOUNTING
DETAIL C
(BOTTOM BRACKET- TOE IN MOUNTING
- WITH #12-24 MOUNTING
DETAIL D
(TOP BRACKET-RAILS
WITH #12-24 MOUNTING)
A
B
C
D
1/2" Ext. Tooth Washer
1/2"-13 x 1" lg.
Hex Cap Screw
Vertical Upright
Bottom Width Bracket
Shown Toe Out Mounting
1/2"-13 Hex Nut
1/2"-13 x 1" lg.
Hex Cap Screw
DETAIL A
(TOP BRACKET-RAILS
WITH M6 MOUNTING)
DETAIL B
(BOTTOM BRACKET- TOE OUT MOUNTING
- WITH M6 MOUNTING
DETAIL C
(BOTTOM BRACKET- TOE IN MOUNTING
- WITH #12-24 MOUNTING
DETAIL D
(TOP BRACKET-RAILS
WITH #12-24 MOUNTING)
A
B
C
D
Assembly with
Toe In Mounting
Bottom Variable
Depth Side Rail
1/2" Ext. Tooth Washer
1/2" Ext.
Tooth Washer
3.
Use appropriate tool and tighten all hardware (54 ft-lb torque is