
7
Plumbing and Mechanical Installation
Inlet pipe-work. Install 2 inch (50mm) diametre wide pipes. Ensure a slight fall is provided in all
pipe-work entering unit. The Grease Guardian includes quick connect rubber couplings and blank-
ing caps. Note that the fixtures pipe can enter the Grease Guardian inlet from left or right. (above
rear view shows from right) If multiple pipes are being plumbed from opposite directions, under
normal plumbing codes these must all combine to enter via one pipe via one direction only and
should not be plumbed from both directions.
Ventilation Tee and branch pipe. (Recommended) to prevent odours escaping from the Grease
Guardian into kitchen area. Ventilation should be terminated at the building’s stack vent. If ventila-
tion is not provided at inlet, the pump/clean out frequency of the system may have to be increased
to reduce potential waste odours.
1
2
Plumbing Sequence.
Check all required clearances in reference to the “Product Dimensions and
Specification” page in this manual.
EXAMPLE. UNDER SINK—REAR VIEW
Lifting/Handling:
This product is classed as a heavy item that should not be handled alone. There is a require-
ment for 2 people to manually lift all models described in this manual. Steel tipped toe capped
shoes and handling gloves should also be worn.
Install these product models only at ambient room temperature, either under or
adjacent to the fixtures being served.
Do not repurpose the system or add to the num-
ber of fixtures specified for connection at time of sale.
Summary of Contents for GGX15/110VAC
Page 23: ...23 Parts Explosion Wash Systems External Fittings ...
Page 24: ...24 ...
Page 25: ...25 ...
Page 29: ...29 ...