GRAUPNER/SJ GmbH D-73230 KIRCHHEIM/TECK GERMANY
Modifications reserved. No liability for printing errors.
08/2014
4
The picture shows the noseleg unit (9) installed, and the main undercarriage (8) fitted
in the slot. Note that the angled edge of the main undercarriage unit faces forward.
The illustration shows the motor (7) and its connections. Take care to connect wires
of the same colour, and check that the plugs and sockets are pushed together fully.
The motor can now be slid into the fuselage.
The picture shows a screwdriver being used to tighten the motor retaining screw.
Please be sure to observe the following points:
Attention: first unscrew the motor retaining screw (7) using the cross-point
screwdriver (14), and apply a drop of UHU thread-lock fluid to it. The screw