background image

8

7 A

M

Models

Non-Enclosure Mount

DTMV40-M

24-hour, Mechanism Only

DTQMV40-M

24-hour w/Battery Backup, Mechanism Only

DTMV40-P

24-hour, Panel Mount

DTMV40-B

24-hour, Bracket Mount

DTQMV40-B

24-hour w/Battery Backup, Bracket Mount

PROGRAMMING

(Synchronous and Quartz Models)

Setting the Time:

Turn the minute hand clockwise until the time of day (and AM
or PM) on the outer dial is aligned with the triangle marker on
the inner dial.

Note: All units with Battery Backup provide up to a week of
reserve carryover.

Setting Defrost Initiation Time:

Move a white tab (tripper) on the outer dial outward at each
desired  initiation  time.  For  example,  to  set  defrost  initiation
times  at  6:00AM,  11:30AM,  4:30PM  and  11:00PM,  move  the
tab adjacent to the “M” in AM on the dial (6:00AM), the tab that
lies between 11:30AM and 11:45 AM, the tab between 4:30PM
and  4:45PM,  and  the  tab  adjacent  to  the  11:00–11:15PM
marks. (See note for 8243/6243 replacement.)

Setting Maximum Defrost Duration:

Different defrost durations may be set for each defrost initiation
setting.  Each  white  tab  (tripper)  provides  a  15  minute  interval.
The tabs that set the initiation time provide a minimum of 15 min-
utes of defrost. For longer defrost duration, move additional tabs
(following  in  time)  from  the  initiation  tab.  For  example,  if  a  45
minute defrost is to start at 7:00AM, move the tab outward that
lies between 7:00 and 7:15 on the AM side of the dial, and the
tabs adjacent to 7:15-7:30 and 7:30-7:45.
(3 tabs moved outward). The defrost will
initiate  at  7:00AM  and  time  terminate  at
7:45AM (if temperature termination does
not occur first.)

For electronic models, refer to sepa-
rate programming instructions.

DO NOT ROTATE MINUTE HAND COUNTER-CLOCKWISE

Model Designation

Models

Enclosure Mount

DTMV40

24-hour, Outdoor UL TYPE 3R Enclosure

DTQMV40

24-hour w/Battery Backup, 
Outdoor UL TYPE 3R Enclosure

DTMV40-IM

24-hour, Indoor Metal UL TYPE 1 Enclosure

Note: It is necessary to apply power across terminals 1&N
in order to perform electrical test.

2

Reviews: