32
APEX — Installation and Service Manual
Section 2 — Planning Guide
Space and Ventilation Requirements
The Apex frame requires 11 rack units (19.25 inches) of vertical space and
is approximately 10.3 inches deep. The ventilation system draws cooling
air through openings all along the bottom and in the top third of the left
side. Warm air is exhausted through two fans located in the top right side.
The left and right sides must therefore be kept clear of obstructions. It is not
necessary to leave open space above or below the chassis. See
Note
Heat-generating equipment must not be mounted beneath the Apex chassis.
Figure 2. Apex RF-34075 75 Ohm Frame (RF-34110 110 Ohm Frame Similar)
Refer to the following figures for standard Apex frame illustrations:
•
illustrates a standard Apex FRM-34075 256 x 256
75 Ohm frame.
•
illustrates a standard Apex FRM-34110 256 x 256
110 Ohm frame.
•
A detail of the top rear Auxiliary panel for both frames is given in
.
Refer to
for installation instructions for both frames
and configuration using the top rear panel.
9.100
9.100
10.281
10.281
19.220
19.220
11 RU
11 RU
Dual exhaust fans
Air intake along bottom of unit
Air intake openings
Left side
Front
Right side
Summary of Contents for APEX -
Page 4: ...4 APEX Installation and Service Manual ...
Page 6: ...6 APEX Installation and Service Manual ...
Page 10: ...10 APEX Installation and Service Manual Contents ...
Page 12: ...12 APEX Installation and Service Manual Preface ...
Page 28: ...28 APEX Installation and Service Manual Regulatory Notices ...
Page 70: ...70 APEX Installation and Service Manual Section 2 Planning Guide ...
Page 108: ...108 APEX Installation and Service Manual Section 3 Installation ...
Page 116: ...116 APEX Installation and Service Manual Section 4 Troubleshooting ...