2 Operating
2.1 Start up procedure
Fig. 5 Granule filling
33 Empty the Granule Collector
with PowerGranules into the
left part of the wash tank.
See Fig. 5
Granule filling
Fig. 6 Drain valve
44 Close the drain valve on the
front of the machine
See Fig. 6
Drain valve
55 Switch on the main electrical switch.
18
Rev. 2021-09