background image

7

Wood Ceiling

1. Saw an oblong groove at a required position (figure 1); Please measure the distance H between concrete roof 

and ceiling surface correctly (figure 2).

Concrete Roof

Roof Surface

Ceiling Surface

Wood Ceiling

H

L(

)

26mm

Total length of screen  minus

15

8m

m

Figure1

Figure2

11. Installation Completed (figure 25).

.Note: the length of M12 bar is 500mm. Please prepare the bar your self if the distance H (between concrete roof 

and ceiling) is longer than 600mm.

Figure25

8

4, Please follow the below steps to install the power cord which recessing in casing . 

1)Take out the power cord (figure 6).

2)Loose the screws of power box and take out the power box (note: the power box must be buttoned on the hanger 

of bracket according to figure 11, please put up and move back the power box to take out), because the power 

cord has a limit, please do not draw it strongly. 

3)Loose and take out two rubber screws, then remove the end cap (figure 8).

4)Remove the line cover of end cap, and then fill in the power line. Afterward, stuck the line cover back to end cap, 

then install the power line outside the casing (figure 9)

5)  Please complete the installation of end cap and fasten two rubber screws; do not need to install the power box 

at this moment.

5. Install the whole screen on the hanging bracket (figure 11-12)

Fi gur e 4

Fi gur e 5

Figure9

Figure7

Figure8

Figure6

Figure11

Figure12

3.Please measure the security distance between hanging brackets (figure 4), and fix the hanging brackets on the 

ceiling using expansion screws (figure 5).

L

26m m

Tot al lengt h of scr een

minus

1

5

8

100

7

9

H

100

minus

Power Line

10

2.This screen equips bracket, and build up the hanging bracket using the hook, M12 nut and M12 bar. Cut the length of M12 bar to 

H minus 100mm(H is the distance between concrete roof and ceiling surface) (Note: H is 500mm, the length of hanging bracket is 

400m which is 500mm minus 100mm) (figure 3).

Fi gur e 3

M12 Bar

M12 nut

Hook 

Brooch

H

1

0

0

m

m

m

in

u

s

100. 0

L

94

minus

1

0

0

H

Power Box

Screw

EXT IR

            

External 

Infrared Receiver

Pow er Li ne

Li ne Cover

Rubber Screw

End Cap

Fo ur Hangi ng 
Boar ds ar e in middl e.

Summary of Contents for RCB-MIR

Page 1: ...manual Power line disconnection Screen responds nothing to any operation B1 B2 H W A B3 L 170 170 Reason Solution GRANDVIEW REPRODUCING GENUINE COLORS Thank you for purchasing a Grandview projection screen Before use please read instructions carefully After installation store instructions for future reference B1 B2 B3 32 6 35 8 35 9 39 9 40 4 44 8 32 2 35 6 33 0 36 4 35 5 39 5 37 4 41 4 38 8 43 0 ...

Page 2: ...about power line device interface power plug please contact the professional people 11 After installation please locate a power device in order to disconnect power or connect the power plug to electrical socket This electrical socket should be installed to a convenient position If the accident occurs during operation please disconnect power or take out the power plug 12 The ceiling or wall used fo...

Page 3: ...be careful while operating too much retracting will cause the damages of screen and motor E Synchro Power Relay optional After connecting the Wireless Synchr o Conver ter the screen can be controlled by FM modulation wireless controller which can cooperate with Sychro Power Relay and switch of projector to control the up and down of screen synchronously D External Wall Switch optional The wall swi...

Page 4: ...serted by external infrared receiver then please fix it in eyes for control External Infrared Input A Manual Control The manual control button is under power box Close to power line Cyclic Control Cyclic Control Up Stop Down Stop C Trigger 1 Please connect 2 5mm plug of trigger to the TRIG input on the screen connect 3 5mm plug to the output on trigger only for the equip ments which have trigger f...

Page 5: ...igur e 11 Four Hangi ng Boar ds are in middl e 100 H L 94 minus H 100 minus 180 100 Figur e6 Power Line Figur e7 Figur e8 Figur e9 11 Product Instruction 11 Installation Completed figure 27 Note the upward instructions are only suitable for the distance H which between 200 600mm if the distance is greater than 600mm please follow the steps as below 1 Install the hanging bracket at a required posit...

Page 6: ...lease align baffle with ceiling board 6 Connect the power after installation Figure21 Signal Line Exit Figure22 Figure24 Figure25 Figure26 Figure23 5 Please stay the screen in the opposite direction and fix the left and right hanging board on the screen using M6 screw and nut figure 12 6 Install the whole screen on the hanging bracket figure 13 14 7 Fix the screen using M12 nut figure 15 then adju...

Page 7: ...in and remove the end cap please ensure the power line is fixed step 3 can be follow 2 Insert the control system signal line to corresponding output figure 11 and take out the signal line from control system signal line exit figure 18 3 Reinstall the end cap after completed control system and fasten the two rubber screws then reinstall the power box and fasten two screws according to step 4 Figure...

Page 8: ...line cover of end cap and then fill in the power line Afterward stuck the line cover back to end cap then install the power line outside the casing figure 9 5 Please complete the installation of end cap and fasten two rubber screws do not need to install the power box at this moment 5 Install the whole screen on the hanging bracket figure 11 12 Figur e 4 Figur e 5 Figure9 Figure7 Figure8 Figure6 F...

Reviews: