background image

GPCP-E is combined by GPCP and GPE

Firstly,  collect  the  power  wires  to  the  main  bar  as  figure  1. 
Invaginate the low cap to the main bar as figure 2. Install the 
low  board  to  the  main  bar,  and  then  fasten  the  screws 
(accessories 5 ) as figure 3. Finally, install the front board to 
installation board of main bar and install the adjuster to the 
front board, and then fasten the screws (accessories 6) as 
figure 4.

1

2

1-1

1-3

1-4

2-2

1-2

2-1

2-3

GPCP Main Bar Overview
1-1  Top Cap
1-2  Front Board
1-3  Subsidiary Bar
1-4  Main Bar
1-5  Installation Board
2-1  Low Cap
2-2  Low Board
2-3  Fixation

GPD Adjustment Overview
3-1  Adjuster
3-2  Horizontal Adjusting 
         Button
3-3  Vertical Adjusting 
         Button
4-1  Installation Bracket
4-2  Rotation Adjusting Screw
4-3  Installation Arm
4-4  Adjustable screw
4-5  Sliding Installation 
         Button
4-6  Installation Base

1-5

accessory 5

Parts

Scope for installation (Installation hole of projector):
Maximum scope for installation:390mm diameter
Minimum scope for installation:20mm diameter

Note: Connect the installation arms to the projector conversely for different installation 
holes of projector.

Maximum diameter: 390mm

Scope

Minimum diameter: 20mm

Scope for installation (H is the distance between ceiling and projector)
The H of GPCP-E4060 is 420mm~600mm
The H of GPCP-E6090 is 600mm~900mm
The H of GPCP-E90150 is 900mm~1500mm

Scope

Steps of installation

figure 1

figure 2

figure 3

figure 4

Install the fixation on the wall (choose the screws according 
to  the  materials  of  wall,  Use  the  screw  of  accessory  7  for 
concrete-wall, and use the screw of acessory 8 for wood-
wall) as figure 5.And then, install the Main Bar Overview to 
the  fixation  and  fasten  the  screws  (accessory  5).  Finally, 
connect  the  GPE  Adjusting  Overview  to  the  adjuster  and 
then fasten the screws (accessory 6 ) as figure 7.  

Steps of installation

figure 5

figure 7

figure 6

Details of installation

Wires collection

Loosen out the positioning screws of main bar (1-4) as figure 8, and then 
take  apart  subsidiary  bar  (1-3)  from  main  bar  (1-4).    Put  the  wires  into 
the  main  bar  (1-4)  then  insert  the  wires  to  the  plastic  groove  of 
subsidiary bar (1-3). And then, re-install the subsidiary bar (1-3) to main 
bar (1-4) after collecting the wires as figure 9-10.

figure 8

figure 9

figure 10

①M3X8 Philips Screw (4pcs)
②M4X8 Philips Screw (4pcs)
③M5X8 Philips Screw (4pcs)
④M5X8 Philips Screw (4pcs)
⑤M6X12 Anti-Slip Screw (2pcs)
⑥M5X10 Philips Screw (7pcs)
⑦M6X25 Tapping Screw (4sets)
⑧    6X50 Wood Screwn (4sets)

Accessories

3-1
3-2

3-3

4-1

4-5

4-2

4-4

4-3

4-6

H

GPCP-E

Reviews: