8
STEP 2: INSULATION INSTALLATION
Drape the large piece of boiler block insulation directly over the block taking care to provide equal
coverage on both sides.
If installing a 7,8, or 9 section boiler, the extension insulation
should be draped over the rear 3 sections of the boiler
. Install the rear insulation piece by
sliding it over the upper tie rods and around the flue collar as shown. Secure the rear insulation
to the boiler block insulation using the foil tape provided.
STEP 3: REAR PANEL INSTALLATION
Remove the four nuts from the rear of the tie rods. Slide the rear panel onto the tie rods until it
sits flush against the spacers. Re-install the nuts. Tighten the nuts to secure the rear panel.
STEP 4: SIDE PANEL ATTACHMENT
Remove the four nuts and washers from the front of the tie rods.
Summary of Contents for Cast Iron Boiler Series
Page 26: ...26 10 3 HYDROSTAT 3250 CONTROL Setting the control...
Page 27: ...27...
Page 30: ...30 12 0 EXPLODED PARTS VIEW...