
INSTALATION
Requirements for optimum installation
REQUIREMENTS FOR AN OPTIMAL INSTALLATION
To obtain the maximal performance and the best results, we recommend installing
the balance according to the following requirements:
a) Install it on a firm and stable surface.
b) Place it on a stable base free of vibrations.
c) Don´t expose it to direct sunlight.
d) Don´t submit it to atmospheres with corrosive gases.
e) Keep it in an environment free of dust and dirt.
f) Work at temperatures between 15º and 30º C.
g) Use the balance in environments with humidity lower than 95% HR.
h) Keep the balance away from equipment that produces magnetic and
acoustical interferences
i)
Calibrate it in its definitive location and check it regularly with the optional
calibration weight, if necessary, recalibrate it.
Unpacking
Unpack the balance carefully. Inside the carton you will find the following
components:
1. This operation manual (please, read it before to use the balance).
2. A balance, series STZ
3. A stainless steel pan
4. An AC/Adaptor of 12 V / 800 mA; don´t use any other adaptor, it could damage
the balance.
VERY IMPORTANT:
Keep the original package. It could be useful in the future in
transporting the balance.
INSTALLATION
Operating temperature: 5ºC – 35ºC
Range of temperature fluctuation:
≤
2
°
C/h
Relative humidity: 50
%
-85
%
1. Place the balance on a firm and stable surface.
2. Connect the AC/Adaptor
3. Press the key to turn on the balance, the display will show
“8.8.8.8.8.8”, the maximal capacity, “S—CAL” and finally “0.0” or “0.00”
3
Summary of Contents for STZ-100
Page 2: ...INDICE SOMMAIRE 2 ...