www.graf.info
17
/
45
Holding brackets
4. Installation and assembly
Remove the GRAF drinking water feeding module from its transport packing; in the same box are also the
other parts and accessories. Firstly, check the whole equipment for any possible damage. Any damage
must be reported before the assembly and installation begins.
4.1
Wall assembly
The GRAF drinking water feeding module must be installed above the back surge level and in a frost free
and dry environment that is above any possible regional flood levels.
When choosing a position for installation it is important to be sure that there is at least 50 cm free space
available above the equipment for any maintenance or adjustment regulation. The wall intended for mount-
ing must be suitable for supporting the equipment with an approxi-mate maximum weight of 40 kg when
filled with water.
The holes to be drilled are marked out on the wall using the holding brackets as a template and then drilled
with a 10 mm masonry bit, the holes should be approximately 60 mm deep. Press the enclosed dowl plugs
into the holes and attach the holding brackets with screws. It is important to mount the holding brackets
perfectly level. The 4 self adhesive rubber buffers should be fixed to the outside corners at the rear of the
drinking water feeding module before mounting. Finally place the drinking water feeding module in position.
Summary of Contents for Aqua-Center Basic 15/4
Page 47: ...Notizen Notes Notas ...
Page 48: ......