
2. Installation of the sewage treatment technology
/
2. Installation of the sewage treatment technology
The tanks must be placed on a level and firm base.
When selecting the location for the treatment plant, note that the sewage treatment facility must be con-
nected to the roof ventilation, or that a separate ventilation pipe must be connected to the facility.
2.1
Assembly of the disc diffusor in the SBR tank
Hose to connect the disc diffusor,
pre-installed.
Disc diffusor with weighted carrier
Cord to lower the disc diffusor into
the tank