Installation
12
3A8626A
All Models
Select the reel bank mounting location (F
. 7).
• For high ceilings, suspend a suitable support
structure for the reels, so the hoses will be long
enough to reach the service area.
• A reel bank mounted in a one-lift service bay should
be at least 6 ft (1.9 m) from the center line of the lift.
• A reel bank mounted in a two-lift service bay should
be mounted an equal distance between the lifts.
• A bank of all motor oil reels should be mounted
about 5 ft (1.5 m) from the center of the lift, toward
the front of the lift rails.
SD or XD Models Only
NOTE: The reference letters in the following instructions
refer to F
. 26.
1. Determine if the position of the roller guide arm (a)
. 8) is in the desired installation position. If it is
not in the desired installation position, skip to Step
The hose reel is factory-assembled and shipped
with the roller guide arm (a) in either the AA or EE
position (F
. 8).
F
IG
. 7
3
1
2
6 ft (1.9 m) minimum for one (1) lift
Center between two lifts
1
2
3
5 ft (1.5 m) minimum for motor oil
F
IG
. 8
AA Shipping Position
EE Shipping Position
AA*
BB
CC
DD
EE
FF
b
a
AA
BB
CC
DD
EE**
FF
b
a
*SD Models without an H or J in the fifth number
position of the model number are shipped with the
roller guide arm (a) in the AA position.
**SD Models with an H or J in the fifth number position
of the model number are shipped with the roller guide
arm (a) in the EE position.
**All XD Models are shipped with the roller guide arm
(a) in the EE position.